Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
348 results
Project
SR 167 Corridor Improvements Project
Timeline: Oct. 2023 - Aug. 2026
The SR 167 Corridor Improvements Project is comprised of the SR 167 Toll Equipment Upgrade Project and the SR 167, SR 516 to South 277th Street Southbound Auxiliary Lane Project. As part of the SR 167 Toll Equipment Upgrade Project, we plan to update the SR 167 toll system to create consistency…
Project
SR 167 Southbound - Union Pacific Railroad Bridge Deck Overlay
Timeline: June 2023 - September 2023
The bridge deck of southbound State Route 167, just north of SR 516/Willis Street, in Kent is worn and has areas of exposed rebar and concrete damage in need of repair. This project will repair concrete and provide a new driving surface for the bridge deck. Construction crews will also replace…
Project
SR 167/SR 516 to S 277th Street – Southbound Auxiliary Lane
Timeline: TBD
WSDOT plans to construct an additional one mile of general-purpose capacity by adding an auxiliary lane on southbound SR 167 between SR 516 and South 277th Street in Kent. The project aims to address operational challenges and will be constructed using existing shoulder pavement.
Project
SR 169 - Ravensdale Creek - Fish Passage - Complete October 2023
Timeline: Summer 2021- Fall 2023
In 2021 and 2022, between Maple Valley and Black Diamond we replaced the culvert that carries Ravensdale Creek under SR 169, along with two other nearby culverts. The existing culverts were narrow, which forces the water through too quickly for salmon and other fish to continue upstream.
Project
SR 169 – Rock Creek, Ginder Creek and unnamed tributaries – fish passage
Timeline: 2020-2029
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals. Beginning as soon as early 2025, WSDOT will begin…
Project
SR 17 - Grape Drive Intersection Improvements - Complete Fall 2022
Timeline: Spring 2021 - Fall 2022
This project removed the existing signal at the intersection and built a multilane roundabout on SR 17 at the intersection of Grape Dr.
Project
SR 17 Moses Lake Vicinity Paving and ADA (Complete Aug. 2024)
Timeline: April 2024-July 2024
A section of roadway on SR 17 between Patton Boulevard and the Interstate 90 interchange is due for resurfacing. Pedestrian facilities at intersections along the way will also be updated to the standards set by the Americans With Disabilities Act.
The project will start with pedestrian…
The project will start with pedestrian…
Project
SR 17 Soap Lake to Lake Lenore Unstable Slopes
Timeline: February 2024-October 2024
The purpose of this project is to remove rock from the slopes along SR 17 between Soap Lake and Lake Lenore, just north of Lake Lenore Caves Road, as well as to install slope protection and stabilization measures to prevent future rockfall. Work will occur on eight slopes along SR 17.
This…
This…
Project
SR 17/Cunningham Road Intersection- Safety Improvement
Timeline: March 2025-June 2025
The project will build a roundabout to replace the current two-way stop intersection at the corner of Cunningham Road and State Route 17 in Adams County near Othello.
Project
SR 18 EB/ C St SW Vic to Green River – Paving & Joint Replacement
Timeline: Spring 2025 - Fall 2025
This project will pave roughly three miles of eastbound State Route 18 from C Street Southwest to Green River. Crews working for WSDOT will rehabilitate the existing roadway surface, deteriorated bridge decks and joints of the C Street Southwest bridge and five eastbound on and off-ramps. Once…
Project
SR 18, Issaquah Hobart Rd to Deep Creek Vicinity – Widening & Fiber
Timeline: 2018 - 2031
SR 18 is a crucial highway connecting the south Puget Sound area with I-90, the state's main east-west route. SR 18 has experienced frequent congestion and collisions for decades.
WSDOT received construction funding from the 2022 Move Ahead Washington transportation package and…
WSDOT received construction funding from the 2022 Move Ahead Washington transportation package and…
Project
SR 18/Preston Mill Park Mitigation
Timeline: Early 2026 - Summer 2026
WSDOT will construct a wetland mitigation site inside the Preston Mill Park/Jim Ellis Memorial Regional Park. Project work includes creating and improving wetlands and sensitive area buffers, grading, stream connections, new access roads, plantings, and other improvements. Most work will take…
Project
SR 18/Unnamed Tributary to Big Soos & Soosette Creek – Fish Passage
Timeline: Fall 2026 - Winter 2029
As part of WSDOT’s fish passage program, we will remove two culverts that do not allow fish to pass and replace them with fish-passable structures along Unnamed Tributary to Big Soos Creek and Unnamed Tributary to Soosette Creek at State Route 18 in Auburn. The new structures have the potential to…
Project
SR 20 - Campbell Lake Road - Intersection Improvements
Timeline: 2016 - Present
The Samish Indian Nation is partnering with WSDOT and Skagit County to develop a practical solution to improve safety and access at the intersection of SR 20 and Campbell Lake Road.
Project
SR 20 Boon Road to Ault Field Vicinity Paving & ADA Compliance - Completed January 2024
Timeline: July 2023 - September 2023
WSDOT made roadway improvement across three sections of a 12-mile stretch of State Route 20 in Island County. The work included grinding off the old pavement, laying new asphalt and installing new pavement markings. This project will extend the life of the existing pavement and create a smoother…
Project
SR 20 Unnamed Tributary to Red Creek Fish Passage - Completed October 2023
Timeline: July 2023 - October 2023
This project removed a metal pipe under the roadway and replaced it with a fish passable structure to improve fish passage for Red Creek and Unnamed Tributary under State Route 20. The work took place between Helmick Road (milepost 68) and Sims Road (milepost 69), east of Sedro-Woolley.
…
…
Project
SR 20 West Fakkema Road – Intersection Improvements
Timeline: Spring 2025 - Summer 2025
Contractors working on behalf of WSDOT will build a compact roundabout at the intersection of State Route 20 and West Fakkema Road. This intersection improvement will help with both mobility and safety.
Project
SR 20 – S. Fork Mill Creek Road to Tiger – Paving
Timeline: August 2024 - September 2024
This project will rehabilitate approximately 11.25 miles of SR 20 in Stevens and Pend Oreille Counties from S. Fork Mill Creek Road to Tiger by removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA) to create a smoother ride and preserve the roadway for years to come.
Project
SR 20/Burlington to Sedro-Woolley - Corridor Improvements
Timeline: Fall 2025 to Fall of 2026
WSDOT is currently working on design plans to address safety concerns along the State Route 20 corridor between Sedro-Woolley and Burlington. The intent of this project is to improve safety along this busy stretch of highway with the construction of intersection roundabouts, pedestrian crossings,…
Project
SR 20/Kearney St I/S – Roundabout – Completed June 2024
Timeline: September 2023 - June 2024
This project took the existing intersection on State Route 20 at Kearney Street in Port Townsend and converted it into a single-lane roundabout.
Project
SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage
Timeline: March 2023 - May 2025
Contractor crews working on behalf of WSDOT will replace the culvert crossings under State Route 20 at an unnamed tributary to Skagit River (milepost 94) and Olson Creek (milepost 105) in Marblemount. The current culverts are barriers to fish passage, which will be replaced with structures that…
Project
SR 202 Skunk Creek and SR 203 Unnamed Tributaries to Snoqualmie River - Fish Passage
Timeline: Spring 2023 - Fall 2026
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where roads act as barriers. In Western Washington, that means replacing culverts and building hundreds of fish-passable structures under state highways by 2030 to create more habitat which is…
Project
SR 202/Evans Creek – Fish Passage and Adaptive Management
Timeline: Summer 2024 - Summer 2025
This project will remove a fish passage barrier along Evans Creek at State Route 202 just west of 236th Avenue Northeast near Sammamish. Contractor crews working for WSDOT will remove an existing 6-foot box culvert and fish ladder and replace it with a fish-passable structure. This new structure…
Project
SR 202/Mud Creek to Snoqualmie River - Fish Passage Project
Timeline: Construction begins in 2027 and runs through 2028.
This project will remove the fish barrier on State Route 202 just east of Fall City at Mud Creek. The project will also improve the safety and reliability of SR 202 by addressing the need for frequent emergency maintenance and channel dredging at the crossing due to sedimentation and flooding of…
Project
SR 202/Sammamish Creek fish passage
Timeline: July 2024 - Fall 2024
In July 2024, WSDOT began replacing two culverts near the intersection of State Route 202 and Northeast 124th Street between Redmond and Woodinville with a single culvert. Two creeks in the area — an unnamed tributary of the Sammamish Creek and High School Creek — will be realigned to merge with…
Project
SR 203/High Rock Rd & 203rd St SE – Intersection Improvement
Timeline: May 2024 - September 2024
Beginning in May 2024, contractors working on behalf of WSDOT built a unique compact roundabout at the intersection of SR 203, High Rock Road and 203rd Street Southeast to improve both mobility and safety between Monroe and Duvall.
Project
SR 204/Unnamed Tributary to Ebey Slough Fish Passage
Timeline: Spring 2022 - Winter 2026
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project
SR 241 - Mabton Vicinity - Retrofit Bridges
Timeline: Summer 2023 - Late Fall 2024
This project removes the weight restrictions and restores the structural integrity of the Mabton bridges. The slough bridge will be replaced, and the bridge over the Yakima River will be retrofitted.
Project
SR 25 - Emergency Culvert Replacement - Complete October 2024
Timeline: June 2024 - August 2024
This project will remove and replace a failed culvert and reconstruct the existing roadway embankment approximately two miles north of Hunters on State Route 25 that failed in April of 2023 after a major rainfall.
Project
SR 26 & I-90 – Eastern Region 2024 Bridge Repair
Timeline: June 2024 - September 2024
This project will rehabilitate the concrete bridge decks on a pair of bridges in Adams County. The first bridge is located on eastbound I-90 that crosses over SR 21 approximately 15 miles west of Ritzville. The second structure is located on SR 26 that crosses over an abandoned railroad just…
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.