• Project

SR 18 EB/ C St SW Vic to Green River – Paving & Joint Replacement

Project overview

This project will pave roughly three miles of eastbound State Route 18 from C Street Southwest to Green River. Crews working for WSDOT will rehabilitate the existing roadway surface, deteriorated bridge decks and joints of the C Street Southwest bridge and five eastbound on and off-ramps. Once contractor crews finish repairing expansion joints and grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved for years to come.

Timeline
Spring 2025 - Fall 2025
Project status
Pre-construction
Funding
$3.87 million

What to expect

During construction, crews will grind the road surface and inlay new HMA. Crews will also rehabilitate deteriorated bridge decks and joints of the C Street Southwest bridge. Throughout the project, there will be nightly ramp and single-lane closures from C Steet Southwest to Green River. Travelers can expect approximately three-weekend closures on SR 18 from C Street Southwest to SR 164. Drivers can also expect a one to two-night closure of eastbound SR-18 for the work concerning BR-18/8S. Times and dates for closures have not yet been determined.

This project will rehabilitate roughly three miles of eastbound State Route 18 from C Street southwest to Green River.