Project

I-5/NB 12th Street NE Bridge – Girder Replacement - Complete Winter 2023

Timeline: August 2022-winter 2023
  • Road
  • Completed
  • Snohomish County
During fall 2022, contractor crews replaced the damaged girder on the 12th Street Bridge over Interstate 5 between Everett and Marysville. In addition to replacing the girder, part of the bridge deck and barrier were rebuilt.
Project

I-5/NB Lowell Rd to Snohomish River - PCCP & Expansion Joints Rehab - Complete October 2023

Timeline: Fall 2022 - Fall 2023
  • Road
  • Completed
  • Snohomish County
We rehabilitated more than 3 miles of pavement, replacing broken panels and grinding the surface to eliminate ruts worn by decades of vehicles. In addition, we replaced expansion joints on four bridges. This project was combined with another rehabilitation project on I-90 to reduce costs.
Project

I-5/NB North Lake Samish to Nooksack River – Concrete Pavement Rehab

Timeline: 2024 - To be determined
  • Road
  • Pre-construction
  • Whatcom County
The project is on I-5 from North Lake Samish (south of the city of Bellingham) to the city of Ferndale near the Nooksack River. The Portland Cement Concrete Panels within the project limits are approximately 60 years old and are near or have exceeded their design life. The project will provide…
Project

I-5/Northgate Way & Maple Rd Bridges – Seismic Retrofit - Complete September 2023

Timeline: Summer 2022 – summer 2023
  • Road
  • Completed
  • King County
Through summer 2023, our contractor crews strengthened three bridges on Interstate 5 so they can better withstand a major earthquake. They wrapped steel “jackets” around the columns that support the bridges to hold the concrete together in an earthquake, reducing the chance of collapse. They also…
Project

I-5/SB East Edgar St to East Gwinn Place Noise Wall - Complete March 2025

Timeline: Spring 2024 – Spring 2025
  • Road
  • Completed
  • King County
This project built a noise wall along southbound Interstate 5 from East Edgar Street to Franklin Avenue East. Contractor crews working for WSDOT constructed the new noise wall to abate noise from the I-5 express lanes just south of the Ship Canal Bridge between Lake Union and Portage Bay. The wall…
Project

I-5/Seattle - Enhanced Ramp Metering - Complete February 2024

Timeline: Winter 2022 - Winter 2024
  • Road
  • Completed
  • King County
We installed new overhead ramp meters at the Swift Avenue South, South Michigan Street/South Bailey Street and Northeast 50th Street on-ramps to northbound Interstate 5 in Seattle. The new ramp meters regulate both the general purpose lanes and the HOV lanes. They replaced existing ramp meters that…
Project

I-5/Secret Creek - Fish Passage

Timeline: February 2025 to December 2026
  • Road
  • Construction
  • Snohomish County
Washington State Department of Transportation and contractor crews will replace existing fish barriers under I-5 and Old Highway 99 near Stanwood with three new fish-passable arch structures to restore fish passage.

On I-5 and Old Highway 99, crews will replace existing culverts…
Project

I-5/Southbound 100th Street Southeast Vicinity to Broadway Avenue – Paving

Timeline: Spring 2025 – Fall 2025
  • Road
  • Pre-construction
  • Snohomish County
This project will grind and pave about four miles of southbound Interstate 5 in Everett, from 100th Street Southeast to Broadway Avenue. Crews working for WSDOT will pave the mainline. This project will also replace impacted traffic loops, pavement markings and replace bridge joints.
Project

I-5/SR 523 Interchange Improvement

Timeline: 2020 - 2025
  • Road
  • Pre-construction
  • King County
People who use the interchange at I-5 and SR 523 (North 145th Street) in Shoreline need safe and efficient ways to move through this area, using all modes of transportation. This will be increasingly important with the arrival of Sound Transit Link light rail and the new Shoreline South/148th…
Project

I-5/Thornton Creek to Lake Washington Fish Passage

Timeline: Summer 2026 - Fall 2029
  • Road
  • Pre-construction
  • King County
This project will remove a fish passage barrier along Thornton Creek under Interstate 5 near State Route 523/NE 145th Avenue in Shoreline. Contractor crews working for WSDOT will replace the two existing 2,000-foot-long, 6-foot culverts with three fish-passable structures. The current culverts are…
Project

I-5/Tributaries to Friday, Lake & Chuckanut Creeks - Fish Passage

Timeline: Spring 2025 - Winter 2028
  • Road
  • Pre-construction
  • Whatcom County
  • Skagit County
This project removes and replaces several outdated culverts under I-5 roads for the Unnamed Tributaries of Friday Creek, Lake Creek, and Chuckanut Creeks in Whatcom and Skagit Counties.

WSDOT will replace outdated culverts with new structures for improved fish migration in the…
Project

I-5/Unnamed Tributary to Penny Creek and Silver Lake Fish Passage

Timeline: Summer 2027 - Winter 2030
  • Road
  • Pre-construction
  • King County
This project will remove three barriers to fish passage along two Unnamed Tributaries to Silver Lake and an Unnamed Tributary to Penny Creek under Interstate 5 near 112th Street Southeast in Everett. Contractor crews working for WSDOT will remove existing culverts and replace them with fish-…
Project

I-5/Yesler Way to Northgate Vic - Pavement, Deck, Joints and Drainage

Timeline: 2020 - 2027
  • Road
  • Construction
  • King County
In January 2025, WSDOT postponed long-term I-5 lane closures between downtown Seattle and Northgate, to align construction spending with available budget. WSDOT is currently working with its contractor, Atkinson Construction, to identify the best way to complete this necessary preservation work…
Project

I-90 - BNRR Bridge to Geiger Road – Paving

Timeline: July 2025 - August 2025
  • Road
  • Not started
  • Spokane County
This project will rehabilitate approximately 5.42 miles of I-90 from BNRR Bridge (MP 267.84) to Geiger Road (MP 273.26) in Spokane County by removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project

I-90 - Eastgate to SR 900 - Corridor Improvements - Complete Spring 2023

Timeline: August 2019 - Spring 2023
  • Road
  • Completed
  • King County
This project adds capacity for both directions of I-90 between Eastgate and West Lake Sammamish Parkway interchanges by restriping the roadway and adding an auxiliary lane. Crews also built sound walls in strategic locations to minimize traffic noise.
Project

I-90 - Ritzville to Tokio - Paving - Complete November 2023

Timeline: Spring 2023 - Fall 2023
  • Road
  • Completed
  • Adams County
This project will rehabilitate roughly 13 miles of Interstate 90 from Ritzville to approximately five miles east of Sprague Lake in Adams County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved…
Project

I-90 - Snoqualmie Pass East - Cabin Creek Interchange to West Easton Interchange (Phase 3)

Timeline: Summer 2022 - Fall 2028
  • Road
  • Construction
  • Kittitas County
Phase 3 is part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity. We are increasing traffic capacity and improving safety by adding a new lane in each direction, replacing concrete pavement, stabilizing…
Project

I-90 - Snoqualmie Pass East - Hyak to Keechelus Dam (Phase 1) - Complete Fall 2019

Timeline: Spring 2009 - Fall 2019
  • Road
  • Completed
  • Kittitas County
Phase 1 was part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Project

I-90 - Snoqualmie Pass East - Keechelus Dam Vicinity to Stampede Pass Interchange (Phase 2) - Complete Fall 2019

Timeline: Summer 2015 - Fall 2019
  • Road
  • Completed
  • Kittitas County
Phase 2 was part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Project

I-90 - Snoqualmie Pass East - Stampede Pass Interchange to Cabin Creek Interchange (Phase 4)

Timeline: Summer 2028 - Fall 2031
  • Road
  • Not started
  • Kittitas County
Phase 4 is part of a 15-mile corridor improvement project to increase safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Major Project

I-90 - Snoqualmie Pass East Project

Timeline: 2009 - 2031
The I-90 Snoqualmie Pass East Project improves 15 miles from Hyak to Easton. Phases 1 and 2 from Hyak to the Stampede Pass interchange are complete. Phase 3 is underway.
Project

I-90 - Sunset Creek - Fish Passage

Timeline: 2023 - 2027
  • Road
  • Construction
  • King County
WSDOT is building bridges over Sunset Creek in Bellevue along both directions of I-90, Southeast Eastgate Way and Southeast 36th Street in Bellevue. These bridges will replace culverts that block fish passage on Sunset Creek, allowing natural stream conditions to return in this section of the…
Project

I-90 Barker to Harvard - Complete October 2023

Timeline: June 2020 - October 2023
  • Road
  • Completed
  • Spokane County
Several projects funded through Connecting Washington and partner funds will address the improvement needs on Interstate 90 at the Barker Road interchange, the Harvard Road interchange and local network connections.
Project

I-90 Bridge Deck Preservation – Patching - Complete July 2023

Timeline: August 2022 - July 2023
  • Road
  • Completed
  • Spokane County
Multiple bridge decks have fallen below an acceptable rating. This project will rehabilitate the bridge decks by patching potholes and replacing fatigued sections of bridge decks.
Project

I-90 Judkins Park Station – Reconnecting Communities

Timeline: 2023-2027
  • Road
  • Pre-construction
  • King County
The I-90/Judkins Park Station—Reconnecting Communities study will identify and recommend changes to the WSDOT I-90 ramps at Rainier Avenue South to improve safe travel for all modes and increase access to the Judkins Park Link light rail station via transit transfer, walking, and biking.
Project

I-90 Mullan Road Overcrossing Bridge Deck Repair - Complete August 2022

Timeline: March 2022 - July 2022
  • Road
  • Completed
  • Spokane County
This project will rehabilitate the deteriorating concrete bridge deck for the Mullan Road Bridge over I-90. Crews will remove approximately 1.5 inches of existing concrete through hydro-demolition. Once removed, existing reinforcing steel that is exposed will be evaluated to determine the need and…
Project

I-90 Soderman Creek/SR 202 Unnamed Tributary to Patterson Creek - Fish Passage

Timeline: Fall 2021 – Fall 2030
  • Road
  • Pre-construction
  • King County
Several blocked culverts below Interstate 90 and State Route 202 in east King County are a barrier to fish migration and will be replaced with new, larger culverts beginning in 2025. Contractor crews working for WSDOT will replace three culverts under I-90 in Preston and one culvert under SR 202…
Project

I-90 Spokane Ramp Meters - Complete June 2023

Timeline: June 2018 - Summer 2023
  • Road
  • Completed
  • Spokane County
Several new ramp meters have been implemented and activated throughout Spokane at on-ramps to both east and westbound I-90 with more coming. The ramp meters are used to space out vehicles as they enter I-90 to reduce the "platooning" of vehicles as they enter and reduce collisions. The…
Project

I-90 Vantage Bridge – Replace Bridge Deck and Special Repairs

Timeline: Spring 2024 - Spring 2028
  • Road
  • Construction
  • Grant County
This project replaces the existing bridge deck on the I-90 Vantage Bridge to maintain the structural integrity, ensure the safety of the highway and extend the life of the bridge. The Vantage Bridge was built in 1962 and the last time the bridge received a major overhaul was in 1982.
Project

I-90 – Guardrail Basic Safety - Rehabilitation

Timeline: July 2025 - October 2025
  • Road
  • Not started
  • Adams County
  • Lincoln County
  • Spokane County
This project will remove, replace, and rehabilitate existing guardrail along I-90 from MP 192 in Adams County to MP 272.60 in Spokane County to preserve function, ensure terminals are crashworthy and that the system meets standards.

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.