Future standard plans
Check here for upcoming approved standard plans.
Future Standard Plans are those approved for publication, that are awaiting the next installment of a revision package (an annual cycle) before they can be referenced from a contract. We post them on the Standard Plans page as they become approved.
A Future Standard Plan may be included in a forthcoming contract as a detail.
Standard Plan | Standard Plan title | Plan sheet |
---|---|---|
Nothing new at this time |
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.