Search projects

Learn about current transportation network improvement and preservation activities throughout the state.

You might be looking for studies or local agency managed projects

Filter projects

Select
Select
Select
Select

356 results

Project

SR 411 Cowlitz River Bridge – Replace Bridge Deck

Timeline: Feb. 2023 - Fall 2024
  • Road
  • Construction
  • Cowlitz County
Starting in early 2023, contractor crews will kick off the much-anticipated project to enhance the SR 411 Cowlitz River Bridge, also known as the A Street Bridge or the PH-10 Bridge. This vital bridge connects the City of Castle Rock to the west side of the Cowlitz River.

The primary…
Project

SR 432 - Industrial Way Vicinity to Cowlitz River - Paver - Completed July 2024

Timeline: Spring 2023 - Summer 2024
  • Road
  • Completed
  • Cowlitz County
In summer 2023 contactor crews working for the Washington State Department of Transportation resurfaced a nearly 2.5 mile stretch of SR 432 between milepost 7.19 near Industrial Way and milepost 7.19 near the Cowlitz River, in Longview, WA. Crews also resurfaced several off- and on-ramps along…
Project

SR 433 Lewis and Clark Bridge Finger Joint Replacement Project - Completed July 2023

Timeline: June 2022 - July 2023
  • Road
  • Completed
  • Cowlitz County
On Sunday, July 16, 2023, bridge crews fully closed the SR 433 - Lewis and Clark Bridge, also known as the Rainier Bridge, spanning across the Columbia River between Longview, WA, and Rainier, OR, for four days. The closure aimed to replace the steel expansion joints that allowed the structure to…
Project

SR 500 - NE 182nd Ave - Intersection Improvements - Complete Fall 2022

Timeline: Spring 2021 - Fall 2022
  • Road
  • Completed
  • Clark County
Beginning in summer 2022, contractor crews from Thompson Bros. Excavating worked to construct a roundabout in east Vancouver, between the intersection of Fourth Plain Boulevard, also known as SR 500 and Northeast 182nd Avenue. Crash data collected over a five-year timeframe between 2013 to 2017…
Project

SR 500 - NE 42nd and 54th Intersection Improvements

Timeline: Summer 2024 - Spring 2025
  • Road
  • Construction
  • Clark County
This project will restore the north/south connection across State Route 500 at the Northeast Stapleton Road/Northeast 54th Avenue intersection in Vancouver by constructing a new pedestrian overcrossing that meets the Americans with Disabilities Act. Restoring access across the highway for people…
Project

SR 500 - NE Robinson Rd and NE 3rd St - Intersection Safety Improvements

Timeline: Summer 2018 - Fall 2026
  • Road
  • Not started
  • Clark County
Growth and development in eastern Clark County is contributing to an increase in traffic volumes and traffic related crashes along SR 500 - between the Northeast Robinson Road and Northeast 3rd Street intersections. To keep people moving safely, reduce travel times and crashes and to ensure this…
Project

SR 500/162nd Ave to 166th Ave – Safe Routes to School - Complete Spring 2024

Timeline: Spring 2022 - Spring 2024
  • Road
  • Completed
  • Clark County
Washington State Department of Transportation’s contractor, Thompson Bros. Excavating, successfully constructed a new shared-use path on the south side of State Route 500, also known as Northeast Fourth Plain Boulevard, between Northeast 162nd and Northeast 166th avenues, allowing those who bike,…
Project

SR 501 - I-5 to Port of Vancouver - Intersection and Profile Improvements - Complete - Sept. 2023

Timeline: Spring 2019 - Fall 2023
  • Road
  • Completed
  • Clark County
Previously, oversized freight vehicles had to divert from this section of Mill Plain Boulevard (SR 501) onto city streets due to high points in the roadway and limited overhead clearances. Corridor modifications increased safety along the corridor for all modes of transportation. Improvements…
Project

SR 503 / NE Rock Creek Rd Intersection Improvements

Timeline: Winter 2021 - Fall 2024
  • Road
  • Construction
  • Clark County
This project improved safety at the intersection of State Route 503 and Northeast Rock Creek Road by installing a compact roundabout. After reviewing five-years of traffic data that included severe injuries, a fatality, and many cases of property damage, this location was identified for improvement…
Project

SR 503 Prairie High School Pedestrian Signal - Completed 2025

Timeline: November 2023 - February 2025
  • Road
  • Completed
  • Clark County
This project constructed a pedestrian hybrid signal, creating safer access for pedestrians crossing State Route 503 to and from Prairie High School and the nearby transit stop.
Project

SR 503 Spur – Culvert Failure

Timeline: Dec. 2023 - Jan. 2024
  • Road
  • Construction
  • Cowlitz County
  • Skamania County
On Saturday, Dec. 23, following the installation of a new 48-inch culvert, stabilizing, and back filling the failure area with rock, and reconstructing the roadway, NW Construction General Contracting, Inc., the emergency contractor has successfully restored two lanes of travel, and lifted the…
Project

SR 504 South Coldwater Slide – Spirit Lake Outlet Bridge Washout

Timeline: May 2023 - 2026
  • Road
  • Pre-construction
  • Cowlitz County
  • Skamania County
Shortly after 9 p.m. Sunday, May 14, 2023, more than 300,000 cubic yards of debris from an adjacent hillside fell approximately 2,000 feet above SR 504 and covered the roadway with rock, mud, ice and water, causing catastrophic damage to the 85-foot Spirit Lake Outlet Bridge at milepost 49.
Project

SR 506/1.5 Miles N of Frontage Rd to I-5 – Emergency Bridge Repair

Timeline: Summer 2022 - Mid-to-late 2023
  • Road
  • Construction
  • Lewis County
On Tuesday, July 6, 2021, an over height load was traveling southbound on I-5 when it struck and damaged the SR 506/Toledo-Vader Road overpass that spans over the interstate. Following the bridge strike, WSDOT bridge inspectors determined that the damage was extensive and they closed the overpass…
Project

SR 507/N of Connor Rd - Culvert Replacement - Complete Fall 2023

Timeline: Fall 2023
  • Road
  • Completed
  • Thurston County
  • Lewis County
Crews removed and replaced a failing culvert under the highway.
Project

SR 509 Completion Project

Timeline: 2015-2029
  • Road
  • Construction
  • King County
The SR 509 Completion Project in King County is part of the Puget Sound Gateway Program, which also includes the SR 167 Completion Project in Pierce County. Together, these projects complete two of the Puget Sound region’s most critical freight corridors and improve access to I-5, the ports of…
Project

SR 509/Miller Creek fish passage

Timeline: 2026-2029
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals.

A culvert below State Route 509 west…
Project

SR 510 - Yelm Loop - New Alignment Phase 2

Timeline: Summer 2025 - Winter 2027
  • Road
  • Pre-construction
  • Thurston County
Crews will build the three remaining miles of SR 510 between Cullens Road and 170th Street Southeast in Yelm. The new connection, like the previously built Phase 1, is proposed to be a two-lane highway with bicycle and pedestrian facilities.
Project

SR 510/McAllister Ct SE & Rockcress Drive

Timeline: Spring 2025 - Fall 2025
  • Road
  • Pre-construction
  • Thurston County
Crews will build a single-lane roundabout. The improvement will reduce the potential for collisions.
Project

SR 513 - Montlake Bridge - Mechanical Rehab, Deck Replacement & Joint Repair - Complete May 2022

Timeline: Summer 2021 - Spring 2022
  • Road
  • Completed
  • King County
In 2021, contractor crews working for WSDOT replaced the more than 20-year-old worn grid deck on the Montlake Bridge. They also made expansion joint and mechanical repairs so the movable span can continue to operate reliably and meet the growing multimodal traffic demands of northeast Seattle. In…
Project

SR 516/Barnes Creek fish passage - Complete Fall 2024

Timeline: 2021-2024
  • Road
  • Completed
  • King County
Prior to construction, which ended in October 2023, a failing clay culvert just 2 feet in diameter carried Barnes Creek under SR 516 near Des Moines. This narrow culvert was a barrier for fish trying to swim upstream. This project replaced that small clay culvert with a new cement box culvert 20…
Project

SR 518/24th Avenue S Bridge - Girder Replacement - Complete November 2023

Timeline: Summer to Fall 2023
  • Road
  • Completed
  • King County
During summer 2023, our contractor crews replaced the damaged girder on the 24th Avenue South bridge over SR 518 near the Sea-Tac International Airport. Crews also made bridge drain and drainpipe improvements in the area.
Project

SR 520 - Floating Bridge and Approaches Bridge Decks and Soffit Sealer - Complete Fall 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Crews working for WSDOT applied spray sealant to the bridge deck and soffits near expansion joints in both directions of the State Route 520 Evergreen Point floating bridge. The sealant will protect the bridge from corrosion, prolong its service life and help keep the bridge in a state of good…
Project

SR 520 148th Ave NE interchange - Overlake Access Ramp - Complete December 2023

Timeline: Summer 2021-Fall 2023
  • Road
  • Completed
  • King County
With this Connecting Washington project, we made multiple improvements to the State Route 520/148th Avenue Northeast interchange within the cities of Bellevue and Redmond.

Our contractor, Granite Construction, built a direct-access off-ramp from eastbound SR 520 to the Overlake…
Major Project

SR 520 Bridge Replacement and HOV Program

Timeline: 2011 - 2031
The SR 520 Bridge Replacement and HOV Program enhances travel safety and mobility with modern, structurally stronger bridges, as well as substantial transit and roadway improvements along this urban corridor. Built in stages, the improvements extend from I-405 in Bellevue to I-5 in Seattle.
Project

SR 520 Eastside Transit and HOV Project - Complete Summer 2015

Timeline: Construction began 2011; completed in 2015
  • Road
  • Completed
  • King County
This project added bus/carpool lanes in both directions between 108th Avenue Northeast in Bellevue and Lake Washington’s eastern shore. The project also built three landscaped, community-connecting highway lids over the highway, two transit stations in the highway median and the first leg of a…
Project

SR 520 Floating Bridge and Landings Project - Complete Summer 2017

Timeline: Bridge construction began in spring 2012 and was completed in summer 2017.
  • Road
  • Completed
  • King County
We replaced the world's longest floating bridge – a four-lane, 1960s-era structure – with a safer, six-lane bridge designed to withstand stronger windstorms and waves. Opened in April 2016, the new bridge also added shoulders for disabled vehicles and a separated, 14-foot-wide path for…
Project

SR 520 I-5 Express Lanes Connection Project

Timeline: August 2021 - April 2025
  • Road
  • Construction
  • King County
The SR 520/I-5 Express Lanes Connection Project will create a dedicated reversible transit and carpool connection between SR 520 and the I-5 Express Lanes, along with a reversible transit/carpool ramp at the I-5/Mercer Street interchange.
Project

SR 520 Montlake Project

Timeline: Summer 2019 - 2024
  • Road
  • Construction
  • King County
The Montlake Project will improve transportation for both motorized and nonmotorized travel along the corridor with a new SR 520 eastbound bridge over Union Bay. This project also builds a new, three-acre lid covering the highway in Montlake that will include regional transit stops and open green…
Project

SR 520 Pontoon Construction Project - Complete Spring 2015

Timeline: Construction of the casting basin and pontoons began in Aberdeen in 2011. Pontoon construction ended in spring 2015.
  • Road
  • Completed
  • King County
The SR 520 floating bridge is supported and stabilized by 77 concrete pontoons . The Pontoon Construction Project built a casting basin and 33 of the bridge’s pontoons in Aberdeen, Washington. We built 44 of the bridge’s smaller pontoons in Tacoma, Washington, as part of the Floating Bridge and…
Project

SR 520 Portage Bay Bridge and Roanoke Lid Project

Timeline: 2024-2031
  • Road
  • Construction
  • King County
The Portage Bay Bridge and Roanoke Lid Project will replace the aging Portage Bay Bridge with a seismically resilient structure that includes improved bus/carpool travel and an extension of the SR 520 Trail. This project also builds a landscaped lid between Seattle’s Roanoke Park and North Capitol…

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.