Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
153 results
Graveyard Spit Dynamic Revetment and Dune Restoration
Publication date:
Contract number: XE3623
Submittal due:
Requires stabilizing and mitigating erosion of the roadway embankment by constructing a dynamic revetment adjacent to the highway to protect it from wave action, traffic control and other work. Involves 46 items 172 working days. Work class 1.
SB 100th St SE Vic to Broadway Ave Paving
Publication date:
Contract number: XE3620
Submittal due:
Requires planing bituminous pavement, paving with hot mix asphalt (HMA), pavement repair, replacing traffic loops, pavement marking, temporary erosion control, traffic control and other work. Involves 47 items and 60 working days. Work class 4 - asphalt paving.
NB Spokane St Ramp Meter Installation
Publication date:
Contract number: XE3619
Submittal due:
Requires furnishing and installing ramp meter system, including Non-Intrusive Vehicle Detector for Ramp Metering, ITS, electrical, signing, temporary erosion and water pollution control, traffic control and other work. Involves 17 items and 29 working days. Work class 41 - intelligent…
Kitsap Vicinity - Paving
Publication date:
Contract number: XE3618
Submittal due:
Requires rehabilitating the existing roadway by planing bituminous pavement, excavating pavement repair areas, paving with hot mix asphalt, bridge deck repair and placing waterproof membrane for bridges, replacing existing pavement markings, traffic control and other work. Involves 47 items and 50…
Eagle Harbor Maintenance Facility Welding Shop Building Replacement
Publication date:
Contract number: XE3625
Submittal due:
Requires constructing a new welding shop, paving, potable water, sanitary sewer, electrical upgrades and other work. Involves 53 items and 235 working days. Work class 7 - building construction.
N of Moclips Highway - Stabilize Slope
Publication date:
Contract number: XE3626
Submittal due:
Requires repairing an existing hillside due to landslide activity. clearing and grubbing, excavation, installing quarry spalls and ditch liner, constructing horizontal drains, restoration planting, traffic control and other work. Involves 42 items and 55 working days. Work class 1 - clearing,…
Maytown Rd to Plum St - Paving
Publication date:
Contract number: XE3624
Submittal due:
Requires milling and filling with HMA, installing a new catch basin, pavement repair, pavement markings, removal of illumination poles and short capping work, traffic control and other work. Involves 48 items and 45 working days. Work class 4 - asphalt paving.
US 395, Hafer Rd to Chewelah - Paving
Publication date:
Contract number: XE3622
Submittal due:
Requires roadway excavation, embankment compaction, drainage modifications, crack sealing, bridge joint sealing, planing bituminous pavement, hot mix asphalt (HMA) paving, joint adhesive, erosion control, seeding and mulching, compost, curb and gutter, sidewalk, guardrail, pavement markings, rumble…
I-90, EB WLS Parkway to E Sunset Way - Paving
Publication date:
Contract number: XE3621
Submittal due:
Requires hot mix asphalt (HMA) paving and planning, pavement repair, replacing traffic loops, pavement marking, temporary erosion and sediment control, temporary traffic control and other work. 52 working days. Involves 37 items. Work class 4 - asphalt paving.
I-90, Harvard Rd Interchange Ramp Meters
Publication date:
Contract number: XE3617
Submittal due:
Planing bituminous pavement, installing maintenance access pads, hot mix asphalt (HMA) paving, guardrail, pavement markings, permanent signing, illumination, traffic signal and ITS systems, directional boring, traffic control and other work. 40 working days. Involves 28 items. Work class 9 & 16…
US 2, West of Leavenworth - Slope Stabilization
Publication date:
Contract number: XE3616
Submittal due:
Requires rock slope scaling, pavement and guardrail repair, slope protection, traffic control and other work. Involves 31 items and 36 working days. Work class 39.
Systemwide On-Call Off-Shore Maintenance
Publication date:
Contract number: XE3615
Submittal due:
Requires improvement of damaged wingwalls and dolphin structures, counterweight cables, anchor chain, anchors, piles, and live load hanger bar replacement at Washington State Ferry Terminals in various Counties on an on-call basis, and other work. The duration of this Contract is from the date of…
I-90, E of Vantage to Moses Lake - Paving
Publication date:
Contract number: XE3613
Submittal due:
Requires pavement repair excavation incl. haul, crack sealing, planning bituminous pavement, hot mix asphalt, permanent signing, traffic control and other work. Involves 52 bid items and 120 working days. Work class 4.
US 395, Lind Coulee Bridge to I-90 SB Lanes Only Paving
Publication date:
Contract number: XE3612
Submittal due:
Requires planing bituminous pavement, crack sealing, hot mix asphalt paving, repairing guardrail, guide posts, rumble strips, pavement markings, traffic control and other work. Involves 53 bid items and 50 working days. Work class 4.
SR 21 and SR 260, 2025 Eastern Region Chip Seal
Publication date:
Contract number: XE3609
Submittal due:
Requires bituminous surface treatment, pavement repair excavation, crack sealing, hot mix asphalt (HMA) for pavement repair and prelevel, joint seal at bridge ends, shoulder finishing, guideposts, pavement markings, erosion control, traffic control and other work. Involves 36 items and 36 working…
US 2, Coles Corner Vicinity - Paving
Publication date:
Contract number: XE3610
Submittal due:
Requires shoulder finishing, pavement repair, bridge deck repair, crack sealing, planing bituminous pavement, removing existing asphalt overlay, hot mix asphalt (HMA), erosion control and water pollution control, pavement markings, traffic control and other work. Involves 51 items and 55 working…
I-5, Gravelly-Thorne Connector Shared Use Path
Publication date:
Contract number: XE3611
Submittal due:
Requires grading, asphalt paving, stormwater facilities, retaining walls, a new pedestrian bridge, signing, illumination, signal improvements, traffic control, roadside restoration and other work. Involves 174 items and 370 workings days. Work class 6 or 20.
Notice of bid opportunity - Intercity Bus Dungeness Line
Publication date:
Submittal due:
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract for WSDOT to provide intercity bus transportation…
US 12, Howell Grade Rd to Garfield-Asotin Co. Line-Paving
Publication date:
Contract number: XE3608
Submittal due:
Full depth reclamation, paving with hot mix asphalt (HMA), installing guardrail, replacing striping and rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. 35 working days. Involves 37 items. work CL 1 or 4.
SR 18, EB C St SW Vic to Green River Paving & Joint Replacement
Publication date:
Contract number: XE3605
Submittal due:
Grinding and inlaying hot mix asphalt (HMA), updating traffic loops, pavement markings, joint work on Bridge 18/9, temporary erosion control, traffic control and other work. 65 working days. Involves 52 items. Work class 4.
US 2 et al, NCR Guardrail Updates 2025
Publication date:
Contract number: XE3606
Submittal due:
Removing asphalt concrete pavement, removing guardrail, quarry spalls, reinforced concrete culvert pipe, crushed surfacing base course, commercial hot mix asphalt, cement concrete, traffic curb and gutter, beam guardrail components, precast concrete barrier, project temporary traffic control and…
Notice of bid opportunity - Transportation Equipment Fund (TEF) Tank Monitoring
Publication date:
Submittal due:
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract for WSDOT to purchase.
TEF has 125…
TEF has 125…
SR 518, Tukwila International Boulevard Station (TIBS) Bus Rapid Transit Project
Publication date:
Contract number: XE3492
Submittal due:
The SR 518, Tukwila International Boulevard Station (TIBS) Bus Rapid Transit (Project) will create a new Bus Rapid Transit (BRT) station on SR 518 between mileposts 2.49 and 2.91, to connect the existing Tukwila International Boulevard Link light rail station and communities to the south of SR 518…
2025 CRISI Rural Rail Rehabilitation CW Branch - PCC
Publication date:
Contract number: XE3602
Submittal due:
Removing sidewalk, curb and gutter, crossings, turnouts, rail, ties, cleanup and disposal of legacy material and roadway excavation, paving, curb and gutter, sidewalk, pavement markings, culverts, ballast distribution, ties, replacing rail with OTM, rail joints, surface line and dress, undercutting…
SR 26, 1st Ave Roundabout
Publication date:
Contract number: XE3601
Submittal due:
Improvements at the intersection of SR 26 and 1st Avenue in Adams County, roadway excavation including haul, crushed surfacing base course, textured and pigmented cement concrete pavement, roundabout cement concrete curb and gutter, illumination system, traffic control and other work. Involves 83…
SR 20, W Fakkema Rd Intersection Improvements
Publication date:
Contract number: XE3599
Submittal due:
Installing one compact roundabout, traffic islands, scupper curbing, paving, pavement markings, pavement repair, sign removal/installation, drainage, illumination installation, traffic control and other work. Involves 54 items and 16 working days. Work class 4.
I-5, SB Nooksack River to Blaine Paving
Publication date:
Contract number: XE3600
Submittal due:
Removing guardrail and guardrail anchor, removing miscellaneous traffic items, pavement repair, shoulder fog sealing, sealing existing bridge joint, planing bituminous pavement, hot mix asphalt (HMA) paving, beam guardrail installation and replacement, removing and restoring high tension cable…
SR 9, Marsh Road to 2nd Street Vic - Widening & Bridge Painting
Publication date:
Contract number: XE3596
Submittal due:
Constructing two new south bound lanes and two new south bound bridges, cleaning and painting the metal surfaces of the bridge, illumination, traffic signals, ITS, signing, retaining walls, stormwater facilities, drainage, planing bituminous pavement, hot mix asphalt paving, pavement markings,…
US 395, NSC Sprague Ave to Spokane River - Stage 3
Publication date:
Contract number: XE3595
Submittal due:
New Bridges No. 395/407W and No. 395/407E, three sign bridges, cantilever sign structure, hot mix asphalt paving, signing, curbing and demolition of WSDOT property within the city limits of Spokane. Abatement of asbestos materials, removal and disposal of buildings and contents, fence removal,…
US 2, Sexton Creek to Pilchuck River - Fish Passage
Publication date:
Contract number: XE3597
Submittal due:
Clearing and grubbing, filling the existing culvert, roadway/structure excavation and restoring the existing roadway and stream channel, constructing a precast reinforced concrete three-sided structure, constructing a steel arch structure, constructing wing walls, removing existing drainpipes,…
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.