Contract summary
Clearing and grubbing, filling the existing culvert, roadway/structure excavation and restoring the existing roadway and stream channel, constructing a precast reinforced concrete three-sided structure, constructing a steel arch structure, constructing wing walls, removing existing drainpipes, installing a new catch basin and storm drain pipes, grading, hot mix asphalt (HMA) paving, pavement marking, moment slab, guardrail, roadside restoration, erosion control, temporary stream diversion, temporary erosion and sediment control, traffic control and other work. 96 working days. Involves 140 items. Work class 1 or 6.