US 2, Sexton Creek to Pilchuck River - Fish Passage

Contract summary

Clearing and grubbing, filling the existing culvert, roadway/structure excavation and restoring the existing roadway and stream channel, constructing a precast reinforced concrete three-sided structure, constructing a steel arch structure, constructing wing walls, removing existing drainpipes, installing a new catch basin and storm drain pipes, grading, hot mix asphalt (HMA) paving, pavement marking, moment slab, guardrail, roadside restoration, erosion control, temporary stream diversion, temporary erosion and sediment control, traffic control and other work. 96 working days. Involves 140 items. Work class 1 or 6.

Public Works
Publication Date
Contract status
Advertised
Contract ID
XE3597
County
Snohomish County
Submittal due date and time
Estimated value
$6,000,000 - $7,000,000
Funding source
A state funded project with a 5% small business enterprise goal and a 2% veteran owned business goal.
Contact
Amelia Scharrar
Project Engineer