August bid tabulations
A record of the engineer's estimate and bid amount for each project, by bid item and contractor for the month of August.
2024
- Contract XE3558 - US 97 et al, Illumination and Signal Cabinet Update (PDF 67KB)
- Contract XE3560 - I-90, ER TMC Relocation - Communications Hub (PDF 64KB)
- Contract 23A825 - SR 515, Panther Creek Fish Passage - Demo 1 (Small Works Roster) (PDF 129KB)
2023
- Contract XE3469 - Executed 9/28/2023 I-90, 2.77 Miles West of Tinkham Rd WB Slope Stabilization (PDF 81KB)
- Contract XE3462 - Executed 10/5/2023 I-5, Dike Access Road Bridge - Bridge Deck and Expansion Joints (PDF 82KB)
- Contract XE3446 - Executed 9/28/2023 SR 305, West Port Madison, Agatewood Rd, Adas Will Ln Safety Improvements (PDF 202KB)
- Contract XE3466 - Executed 9/21/2023 2023 OR Region Wide Safety Features - Signing (PDF 61KB)
- Contract XE3461 - Executed 9/28/2023US 2 et al, NWR Breakaway Cable Terminal Replacement 21-23 (PDF 78KB)
- Contract XE3463 - Executed 9/12/2023 SR 14 et al, West Skamania and Klickitat Counties Stormwater Retrofits (PDF 60KB)
- Contract XE3465 - Executed 9/12/2023 US 12 Clear Fork Br/US 97 Br Over Bickleton Rd - Bridge and Deck Rehabs (PDF79KB)
- Contract XE3459 - Executed 9/21/2023 SR 4, 0.2 and 4.53 Miles W of Germany Creek Bridge - Slope Stabilization (PDF 73KB)
- Contract XE3458 - Executed 9/21/2023 SR 17, Soap Lake to Lake Lenore Caves - Unstable Slopes Re-Advertisement (PDF 75KB)
- Contract 23A814 - SR 20, Olson Creek Fish Passage - Demo 1 (Small Works Roster) (PDF 52KB)
2022
- Contract 9864 - Executed 10/24/2022 Strategic Concrete Bridge Deck Preservation (PDF 92KB)
- Contract 9863 - Executed 10/24/2022 Hood Canal Bridge Replace Pontoon Hatches - Phase 2 (PDF 59KB)
- Contract 9859 - Executed 9/9/2022 Airport Rd to E Casino Rd Seismic Retrofit (PDF 82KB)
2021
Contract 9717 - Cancelled West Of White Pass Repair Cable Net Post
2020
- CONTRACT 9581 - Executed 09/09/2020 BAINBRIDGE FERRY TERMINAL PARKING LOT REHABILITATION
- CONTRACT 9585 - Executed 08/28/2020 SR 506 TO RUSH ROAD INTERCHANGE ILLUMINATION REBUILD
- CONTRACT 9588 - Executed 08/10/2020 STAMPEDE PASS I/C EB REPLACE CONCRETE PANELS
- CONTRACT 9582 - Executed 9/29/2020 0.4 MILES W OF BJORNSGARD - SLOPE STABILIZATION PHASE 2
- CONTRACT 9584 - Executed 09/24/2020 LINCOLN CO TO BNSF RR BRIDGE - ROADSIDE IMPROVEMENTS
2019
- CONTRACT 9242 - Executed 10/30/2019 RENTON TO BELLEVUE WIDENING AND EXPRESS TOLL LANES
- CONTRACT 9474 - Executed 9/23/2019 NORTH OF PILGRIM RD E SLOPE STABILIZATION (SMALL WORKS ROSTER)
- CONTRACT 9470 - EDMONDS FERRY TERMINAL TIMBER PILE AND PAVEMENT REPAIRS (SMALL WORKS ROSTER)
- CONTRACT 9473 - Executed 9/23/2019 BOW HILL SB WEIGH STATION PRESERVATION
- CONTRACT 9471 - Executed 9/12/2019 ANACORTES FERRY TERMINAL SHARED PEDESTRIAN IMPROVEMENT
- CONTRACT 9469 - Executed 9/30/2019 SB INTERSTATE BR TO NE 78TH ST VIC ACTIVE TRAFFIC MANAGEMENT
- CONTRACT 9462 - Executed 9/5/2019 NSC BNSF-2ND RAILROAD ALIGNMENT
2018
- CONTRACT 9299 - Executed 8/27/2018 SE 599, SB S 133RD ST & S 124TH ST VIC VMS REPLACEMENT
- CONTRACT 9305 - Executed 8/29/2018 N OF CARBON RIVER BRIDGE ROCK SCALING (Small Works)
- CONTRACT 9301 - Executed 9/20/2018 TRAVELERS REST SAFETY REST AREA - ROOF REPAIR - SCR (Small Works Roster)
- CONTRACT 9302 - Executed 9/13/18 SR 7, PEDESTRIAN CROSSING SAFETY IMPROVEMENTS
- Executed 9/27/2018 JBLM DEMO 2018 (Small Works Roster)
- CONTRACT 9297 - Executed 9/27/2018 I-5, SR 510 INTERCHANGE - RECONSTRUCT INTERCHANGE
- CONTRACT 9309 - Executed 9/13/2018 I-90, 1.0 MILE W OF SNOQUALMIE SUMMIT EB - ROCKFALL MESH REPAIR (Small Works Roster)
- CONTRACT 9311 - Executed 9/11/2018 I-90, GARDEN SPRINGS TO BROAWAY AVE - RAMP METER (Small Works Roster)
- CONTRACT 9300 - Executed 9/20/2018 FACILITIES BRANCH, HYAK WASHBAY SUMP IMPROVEMENTS - SCR (Small Works Roster)
- CONTRACT 9308 - Executed 9/24/2018 SR 20, RAILROAD CROSSING IMPROVEMENTS (Small Works Roster)
- CONTRACT 9310 - Executed 9/24/2018 US 2 EASY STREET EAST PEDESTRIAN TRAIL (Small Works Roster)
- CONTRACT 9312 - Executed 9/24/2018 42ND AND 54TH INTERSECTIONS SAFETY IMPROVEMENTS
2017
- CONTRACT 9136 - Executed 9/18/2017 NOOKSACK RIVER BRIDGE SPECIAL REPAIR - (Small Works Roster)
- CONTRACT 9135 - Executed 9/12/2017 SR 504, WOOSTER CREEK CULVERT REPLACEMENT - CHRONIC ENVIRON. DEFICIENCY
- CONTRACT 9129 - Executed 9/5/2017 SR 163, POINT DEFIANCE FERRY TERMINAL EMERGENCY GENERATOR - (Small Works Roster)
- SR 527, Executed 9/6/2017 15TH AVE SE TO SEATTLE HILL RD BIKE AND PEDESTRIAN IMPROVEMENTS - (Small Works Roster)
- CONTRACT 9131 – All Bids Rejected SR 519, SEATTLE FERRY TERMINAL SLIP 1 OVERHEAD LOADING CYLINDER RENEWAL
- CONTRACT 9134 – All Bids Rejected I-5, MARTIN WAY TO MARVIN ROAD STORMWATER RETROFIT (Small Works Roster)
- Executed 9/7/2017 NSC - HAZARDOUS MATERIAL SITE ABATEMENT - OXARC
- NSC 2017 DEMO NO 2
- CONTRACT 9142 - Executed 9/27/2017 BURLINGTON PEO TENANT IMPROVEMENTS
- CONTRACT 9141 - All Bids Rejected US 2 ET ALL, STRATEGIC PAVEMENT PRESERVATION 2017
2016
- CONTRACT 8951 - Executed 8/29/2016 US 2, W OF ALICE RD BR DECK REHAB (Small Works Roster)
- CONTRACT 8956 - Executed 8/29/2016 I-90, GOLF COURSE RD IMPROVE PARK & RIDE LOT (Small Works Roster)
- CONTRACT 8818 - Executed 8/29/2016 SR 16 INTERCHANGE - CONSTRUCT HOV CONNECTIONS - Design-Build
- CONTRACT 8950 – Executed 9/6/2016 SR 524, WB 21ST AVE W TO 196TH PL SW PEDESTRIAN IMPROVEMENTS
- CONTRACT 8954 – Executed 9/6/2016 SR 155, COULEE CITY NORTH CENTERLINE RUMBLESTRIPS
- CONTRACT 8958 – Executed 9/6/2016 SR 302, 1.15 MILES S OF E VICTOR RD MAJOR DRAINAGE
- CONTRACT 8940 – Executed 9/29/2016 SR 20 SPUR, ORCAS FERRY TERMINAL FACILITY ADA COMPLIANCE IMPROVEMENTS
- CONTRACT 8955 - Executed 9/7/2016 FACILITIES, VANCOUVER MAIN STREET OFFICE BUILDING 02 - ROOF REPLACEMENT
- CONTRACT 8959 - Executed 9/29/2016 I-405, NE 30TH ST & NE 44TH ST RAMP IMPROVEMENTS
- CONTRACT 8957 - Executed 10/4/2016 SR 104, NE 195TH ST GABION ROCK WALL EMERGENCY REPAIR
2015
- CONTRACT 8798 - Executed 8/28/15 I-90, WINCHESTER EB SRA MINOR REHABILITATION
- CONTRACT 8800 - Executed 9/21/15 SR 410, WHITE RIVER BRIDGE 410/101 BRIDGE ELEMENT REPAIR
2014
- CONTRACT 8654 - Executed 9/2/14 US 2/ SR 207, NCR 13-15 LOW COST PAVEMENT REPAIR & CRACK SEALING
- NSC 2014 DEMO NO 2
- CONTRACT 8651 - All Bids Rejected BRANCH RD/RR XING - UPGRADE WARNING SYSTEMS
- CONTRACT 8656 - Executed 9/15/14 TUMWATER MATS LAB HVAC AND ACCESS CONTROLS - UPGRADES
- CONTRACT 8657 - Executed 9/26/14 I-90, LAKE WASHINGTON FLOATING BRIDGES ANCHOR CABLE REPLACEMENT
- CONTRACT 8658 - Executed 9/10/14 I-5, KLICKITAT DR - UNSTABLE SLOPE
- CONTRACT 8660 - Executed 9/23/14 I-5 & I-205, BI-STATE CORRIDOR TRAVEL TIME - ADD SIGNING
2013
- CONTRACT 8512 - Executed 8/30/13 SR 272, COLFAX AREA DRAINAGE IMPROVEMENTS
- CONTRACT 8519 - Executed 9/8/13 US 101, FAIRMOUNT RD VICINITY SAFETY IMPROVEMENTS
- CONTRACT 8515 - Executed 9/8/13 US101/SR 105, SR 105 HEATHER RD AND US 101 0.5 MI N OF RAYMOND CULVERT REHAB
- CONTRACT 8518 - Executed 8/23/13 I-5, SKAGIT RIVER BRIDGE, BRIDGE ELEMENTS REPAIR
- CONTRACT 8517 - Executed 9/11/13 US 2/97, EASY ST. LINK STOP WB
- CONTRACT 8521 - Executed 9/17/13 OLYMPIC REGION MAJOR ELECTRICAL REHABILITATION REBUILD SIGNALS - STAGE 1
- CONTRACT 8520 - Executed 9/19/13 1.0 MILE W OF SNOQUALMIE SUMMIT EB - ROCKFALL MESH REPAIR
- CONTRACT 8516 - Executed 9/17/13 REYNOLDS AVE SIGNAL REPLACEMENT PROJECT
- CONTRACT 8496 - Executed 10/3/13 NSC - BNSF RAILWAY STRUCTURES/REALIGNMENT
- CONTRACT 8524 - Executed 10/8/13 SR 163, POINT DEFIANCE FERRY TERMINAL TRESTLE REPAIRS
2012
- CONTRACT 8355 - Executed 9/6/12 SPRAGUE LAKE SRA WB - WELL REPLACEMENT
- CONTRACT 8353 - NCR ADA RURAL UPGRADES
- CONTRACT 8352 - Executed 9/4/12 I-5, SPOKANE STREET INTERCHANGE VIC - SPECIAL BRIDGE REPAIR
- CONTRACT 8354 - Executed 9/6/12 US 12, RAILROAD BRIDGE SEISMIC RETROFIT
- CONTRACT 8359 - Executed 9/5/12 OLYMPIC REGION HQ BUILDING 6 ROOF RENOVATION
- CONTRACT 8358 - Executed 9/4/12 VIC. OHOP VALLEY EXTENSION RD TO S. OF 304TH ST E - SAFETY
- CONTRACT 8360 - Executed 9/20/12 BULLFROG WATER TANK REHABILITATION
- CONTRACT 8367 - Executed 9/24/12 INTERCITY BUS PROGRAM - BUS SHELTERS AND BUS STOP INSTALLATIONS
- CONTRACT 8362 - Executed 9/11/12 STATEWIDE DURABLE STRIPING RE-ADVERTISEMENT WITH WORK REMOVED
- CONTRACT 8361 - Executed 9/11/12 WEST OF TWISP WIRE MESH REPAIR
- CONTRACT 8365 - Executed 10/3/12 ELLENSBURG MAINTENANCE SHOP BUILDING ROOF REPLACEMENT
- CONTRACT 8364 - Executed 10/3/12 ROOF REPLACEMENTS WANDERMERE AREA MAINTENANCE FACILITY AND PINES FACILITY
- CONTRACT 8345 - Executed 9/25/12 SR 105, SMITH CREEK AND NORTH RIVER REPLACE BRIDGES
- CONTRACT 8366 - Executed 10/3/12 SR 104, HOOD CANAL BRIDGE SHOULDER RETROFIT
- CONTRACT 8369 - Executed 9/28/12 I-5, BARNES ROAD AND US 12 INTERCHANGES ILLUMINATION UPGRADE
- ALDER CANYON SLIDE EMERGENCY SLOPE STABILIZATION
2011
- CONTRACT 8199 - Executed 9/7/11 SR 161, 24TH ST EAST TO MILTON WAY WIDENING
- CONTRACT 8198 - Executed 9/21/11 SR 519, SEATTLE TERMINAL ELECTRICAL DISTRIBUTION SYSTEM UPGRADE
- CONTRACT 8192 - Executed 9/20/11 SR 519, SEATTLE FERRY TERMINAL - SLIP 2 MECHANICAL & ELECTRICAL REHABILITATION
- CONTRACT 8195 - Executed 9/21/11 NSC - PARKSMITH INTERCHANGE
- CONTRACT 8202 - Executed 9/22/11 PIERCE COUNTY PEO TENANT IMPROVEMENTS
- CONTRACT 8205 - Executed 9/20/11 POINT DEFIANCE AND TAHLEQUAH FERRY TERMINALS TRANSFER SPAN OVERLAYS
- CONTRACT 8189 - Executed 10/13/11 EB NALLEY VALLEY - HOV
- CONTRACT 8177 - Executed 10/5/11 RICE ROAD INTERSECTION - SAFETY IMPROVEMENTS
2010
- CONTRACT 7983 Executed 8/26/10 WSF, PORT TOWNSEND FERRY TERMINAL DOLPHIN PRESERVATION SLIP 1
- CONTRACT 7984 Executed 9/7/10 SR 105, NORRIS SLOUGH CULVERT REPLACEMENT
- CONTRACT 7985 Executed 9/8/10 PCC RAIL, 2010 PCC DRAINAGE REHABILITATION
- CONTRACT 7986 Executed 9/3/10 WSF, SEATTLE FERRY TERMINAL SHEET PILE WALL REPAIR
- CONTRACT 7987 Executed 9/10/10 SR 520, EVERGREEN POINT FLOATING BRIDGE TOLL SIGNING
- CONTRACT 7991 Executed 9/14/10 HYAK PRE-WASH BAY
2009
- CONTRACT 7802 Executed 8/26/09 I-90 & SR 520, LAKE WASHINGTON FLOATING BRIDGES ANCHOR CABLE REPLACEMENT
- CONTRACT 7806 Executed 8/18/09 US195, CHENEY - SPOKANE RD RIGHT TURN LANE
- An American Recovery and Reinvestment Act project
CONTRACT 7796 Executed 8/25/09 I-5 & SR 501, SR 501 RIDGEFIELD INTERCHANGE - CONTRACT 7808 Executed 9/11/09US 101, PURDY CREEK MITIGATION
- CONTRACT 7810 Executed 9/15/09 SR 112, EMERGENCY SLIDE REPAIR 9.4 MILES W OF REYNOLDS RD UNSTABLE SLOPE
- CONTRACT 7812 Executed 9/15/09 SR 520, ADVANCED CONSTRUCTION METHODS AND ENGINEERING FOR PONTOONS
- An American Recovery and Reinvestment Act project
CONTRACT 7805 Executed 9/22/09 US 101 & SR 109, MYRTLE ST TO ENDRESEN AVE & US 101 TO EISENHOWER ST - SIDEWALKS AND ADA RAMPS
2008
- CONTRACT 7596 Executed 8/25/08 SR 261, SMITH HOLLOW ROAD VICINITY STABILIZE SLOPE
- CONTRACT 7589 WSF, PORT TOWSEND FERRY TERMINAL SLIP 1 WINGWALL REPLACEMENT
- CONTRACT 7593 Executed 8/22/08 SR 206, MOUNT SPOKANE STATE PARK VICINITY WASHOUT- REBUILD ROADWAY
- CONTRACT 7591 Executed 9/22/08 I-5, CENTRAL KING TO SOUTH SNOHOMISH BRIDGES-SEISMIC
- CONTRACT 7599 WSF, SEATTLE FERRY TERMINAL TIMBER TRESTLE PRESERVATION
- CONTRACT 7601 Executed 9/2/08 SR 530, SAUK RIVER (SITE #2) STABILIZIE RIVER BANK
- CONTRACT 7600 Executed 9/11/08 SR 26 E. of Vantage Guardrail and Drainage (Small Works Roster Project)
2007
- CONTRACT 7395 EXECUTED 8/17/07 SR 105, JOHNS RIVER BRIDGE PIER REPAIR
- CONTRACT 7397 Executed 8/27/07 I-182, COLUMBIA RIVER BRIDGES JOINT REPAIR
- CONTRACT 7399 Executed 8/28/07 SR 16, CEDAR STREET TO OLYMPIC DRIVE NW-MISCELLANEOUS WORK
- CONTRACT 7398 Executed 9/6/07 SR500, NE 162ND AVE NOISE WALL
- CONTRACT 7387 Executed 9/20/07 US 97, BIGGS RAPIDS BRIDGE 97/1 DECK REPLACEMENT
- CONTRACT 7401 Executed 9/18/07 US 101, VICINITY SUNNYSLOPE ROAD UNSTABLE SLOPE
- CONTRACT 7402 Executed 9/27/07 SR 99, YESLER WAY VICINITY FOUNDATION STABILIZATION
2006
- CONTRACT 7190 Executed 8/16/06--US 12, WHITE PASS VICINITY 2006 ROCKFALL PREVENTION
- CONTRACT 7191 Executed 8/29/06--SR 17, PIONEER WAY TO STRATFORD ROAD
- CONTRACT 7180 Executed 9/5/06--SR 509, VIC MP 22.95 MITIGATION SITE
- CONTRACT 7195 Executed 9/5/06--SR 122, CINEBAR RD. TO JERRELLS RD. GUARDRAIL UPGRADE
- CONTRACT 7185 Executed 9/8/06--SR 18, MAPLE VALLEY TO ISSAQUAH/HOBART RD ROADSIDE RESTORATION
- CONTRACT 7196 Executed 9/8/06--US 101/SR 512, MEDIAN HIGH-TENSION CABLE BARRIER
- CONTRACT 7192 Executed 9/28/06--SR 522, CORRIDOR IMPROVEMENT 153RD SIGNAL & ROADWAY WIDENING
- CONTRACT 7189 WSF, ANACORTES FERRY TERMINAL DOLPHIN REPLACEMENT PHASE II
- CONTRACT 7198 WSF, VASHON FERRY TERMINAL INTERIM TRESTLE PRESERVATION
- CONTRACT 7199 Executed 9/22/06--I-90, KING ST STATION 4TH AVE RETAINING WALL
2005
- CONTRACT 7023 Executed 8/25/05--SR 20, DECEPTION PASS STATE PARK VICINITY UNSTABLE SLOPE
- CONTRACT 7022 Executed 8/25/05--I-90 MEDIAN CROSSOVER PROTECTION
- CONTRACT 7021 Executed 10/10/05--SR 529, SNOHOMISH RIVER BRIDGES 529/10 E & W MOVABLE BRIDGE REPAIR
- CONTRACT 7024 Executed 98/29/05--I-5, PRAIRIE CREEK TO MAYTOWN - MEDIAN BARRIER
- CONTRACT 7018 Executed 9/01/05--SR20, MONKEY HILL RD TO TROXELL RD
- CONTRACT 7025 Executed 10/12/05--I-5, INTERURBAN TRAIL 124TH ST BICYCLE/PEDESTRIAN O'XING
- CONTRACT 7026 Executed 9/16/05--I-5 ET AL, PUGET SOUND VIC. CABLE GUARDRAIL
- CONTRACT 7027 Executed 9/16/05--I-82 & US 12, ALPOWA VICINITY AND COLUMBIA RIVER VARIABLE MESSAGE SIGNS
2004
- CONTRACT 6832 Executed 8/31/04--SR 18, COVINGTON WAY TO MAPLE VALLEY-ROADSIDE RESTORATION
- CONTRACT 6834 Executed 09/13/04--WSF, SYSTEMWIDE FERRY TERMINAL VEHICLE TRANSFER SPAN HYDRAULIC AND CONTROL UPGRADE
- CONTRACT 6835 Executed 9/13/04--I-5 ROANOKE VICINITY NOISE WALL
- CONTRACT 6840 Executed 09/07/04--I-90, GRANT COUNTY LINE TO VICINITY SR 21
- CONTRACT 6837 Executed 9/03/04--I-90, GEIGER RD TO US 2 MEDIAN BARRIER
- CONTRACT 6836 Executed 9/13/2004--SR 290, HELENA ST. LEFT TURN CHANNELIZATION
- CONTRACT 6838 Executed 9/13/04--I-82, PLYMOUTH POE - WIM
- CONTRACT 6843 Executed 9/13/04--UNION GAP WELDING SHOP RENOVATION
- CONTRACT 6845 Executed 9/8/04--I-5, SR 16 TO YAKIMA AVENUE-SB AUXILIARY LANES-PAVING
2003
- CONTRACT 6646 Executed 9/8/03--SR 167, VICINITY BR 167/125E DRAINAGE MODIFICATIONS
- CONTRACT 6645 Executed 9/8/03--CATHLAMET SITE RENOVATIONS
- CONTRACT 6638 Executed 9/10/03--I-5, MURRAY CREEK OUTFALL RETROFIT
- CONTRACT 6652 Executed 9/12/03--I-5, LYNNWOOD 44TH AVE BRIDGE REPAIR
- CONTRACT 6640, Executed 8/29/03--INDIAN JOHN HILL SAFETY REST AREA SANITARY SEWERAGE IMPROVEMENTS
- CONTRACT 6650 I-5 GRAVELLY LAKE TO 49TH ST-FIBER OPTICS
2002
- CONTRACT 6420 Executed 8/27/2002 TUMWATER HQ ELECTRICAL UPGRADE
- Contract 6422 Executed 8/28/2002 WSF, SYSTEMWIDE SECURITY GATES
- Contract 6425 US 101, EVERGREEN PARKWAY VIC. SLIDE REPAIR
- Contract 6423 WSF, BAINBRIDGE FERRY TERMINAL PAVEMENT REPAIR
- Contract 6426 Executed 9/10/2002 I-5, INTERSTATE SIGN SUPPORT STRUCTURES
- CONTRACT 6431 Executed 10/11/2002--RADIO TOWER FOUNDATIONS 2002
- CONTRACT 6415 SR99 TO SR 526 - PHASE 2 AND ITS
- CONTRACT 6428 All Bids Rejected US2 & US 97, CASHMERE VICINITY SIGNAL BEACONS
2001
- Contract 6213 executed 8/17/01- SR 101, LELAND CREEK VIC
- Contract 6217 executed 8/27/01- SR 3, BARNEY WHITE ROAD
- Contract 6180 executed 8/16/01- SR 525, CLINTON FERRY TERMINAL, DOCK EXPANSION PHASE II
- Contract 6202 executed 8/17/01- SR 5 & 543, BORDER XING INFO - PHASE 1
- Contract 6195 executed 8/21/01- SR NSC-HAWTHORNE ROAD TO SR 2 GRADING
- Contract 6199 executed 8/31/01- SR 5, SR 104 TO WB TO NB I-5 ON RAMP
- Contract 6219 executed 9/4/01- SR 2, PINE CANYON SLIDE
- Contract 6214 executed 9/6/01- SR 290 BRIDGE REPLACEMENT 290/4
- CONTRACT 6222 executed 9/27/01- TUMWATER MATERIALS LAB VENTILATION SYSTEM REPAIR
- CONTRACT 6198 executed 9/25/01- SR5, MERCER ST VIC TO 42ND ST ELECTRICAL SYSTEM REBUILD
2000
- CONTRACT 1643 PIER 46 SEATTLE GANGWAY REPLACEMENT
- CONTRACT 5892 SR 525 MUKILTEO FERRY TERMINAL WINGWALL REPLACEMENT PROJECT
- CONTRACT 5923 BAINBRIDGE FERRY TERMINAL DOLPHIN MAINTENANCE PROJECT
- CONTRACT 5936 TIGER RESEEDING
- CONTRACT 5937 EAGLE HARBOR MAINTENANCE FACILITY FLOATING DOLPHIN "18" REPAIR
- CONTRACT 5938 SULTAN-STARTUP ROAD CHANNELIZATION
- CONTRACT 5939 SAMISH RIVER BRIDGE 9/223 SCOUR REPAIR
- CONTRACT 5940 NE 145TH ST (SR523) VIC TO NE 155TH ST PEDESTRIAN ENHANCEMENTS
- CONTRACT 5943 SR 5 NORTHBOUND DOWNTOWN CHANNELIZATION--AVAILABLE SOON
- CONTRACT 5945 SR 105 VIC TO MONTESANO ST.
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.