July bid tabulations
A record of the engineer's estimate and bid amount for each project, by bid item and contractor for the month of July.
2024
- Contract XE3555 - SR 161, Unnamed Trib to South Creek - Remove Fish Barrier (PDF 363KB)
- Contract XE3554 - SR 522, UNT TO Evans Creek Adaptive Management (Small Works Roster) (PDF 137KB)
2023
- Contract XE3460 - Executed 8/23/2023 SR 507, N of Connor Rd - Culvert Replacement (small works roster) (PDF 146KB)
- Contract XE3455 - Executed 8/17/2023 SR 105, Washaway Beach Vicinity – Slope Protection (PDF 143KB)
- Contract XE3454 - Executed 8/14/2023 US12, Nine Mile Hill to Frenchtown Vic-Turnback Improvements Phase 2 (PDF 67KB)
- Contract XE3447 - Executed 8/28/2023 I-90, North Bend to Snoqualmie Pass Vic Deck Rehabs and Drainage Repair (PDF 153KB)
2022
- Contract 9850 - Executed 9/9/2023 BN RR Bridge to Ped Trail Bridge Seismic Retrofit (PDF 101KB)
- Contract 9858 - All Bids Rejected 8/11/2022 1 Mile W of Salmon Falls Rd Repair Debris Fence (PDF 27KB)
- Contract 9857 - All Bids Rejected 8/10/2022 68th Ave S Vicinity Pedestrian Safety - Phase 2 (PDF 40KB)
- Contract 9855 - Executed 9/2/2023 SCR Region Wide - Roadside Hardware Preservation (PDF 54KB)
- Contract 9851 - Executed 9/2/2023 Northwest Region HMA Crack Seal and Pavement Repair (PDF 22KB)
- Contract 9714 - Executed 8/15/2022 Mason and Thurston Co Fish Barriers - Remove Fish Barriers (PDF 126KB)
- Contract 9853 - Executed 9/2/2022 Locust Way Vic to Larch Way Vic Drainage Repair - Small Works Roster (PDF 31KB)
2021
- CONTRACT 9707 - Executed 8/31/2021 LAKE CREEK AND NORWAY PARK CREEK FISH PASSAGE
- CONTRACT 9713 - Executed 9/22/2021 US 101 INDIAN CREEK REMOVE FISH BARRIER
- CONTRACT 9705 - Executed 8/24/2021 FLOATING BRIDGES ANCHOR CABLE REPLACEMENT
- CONTRACT 9715 - Executed 8/03/2021 STRATEGIC PAVEMENT PRESERVATION 2021
- CONTRACT 9708 - Executed 8/24/2021 HOMER HADLEY EAST APPROACH BRIDGE MODULAR JOINT EXPANSION
- CONTRACT 9709 - Executed 8/27/2021 MULLAN RD CROSSING BRIDGE DECK REPAIR
- CONTRACT 9710 - ALL BIDS REJECTED 7/274/2021 US 12 AND SR 105 SPUR SIGNAL REMOVAL AND ADA COMPLIANCE - SMALL WORKS ROSTER
- CONTRACT 9706 - Executed 8/06/2021 GOLD BAR VIC VIRTUAL WEIGH IN MOTION
- CONTRACT 9573 - Executed 8/27/2021 NE 132ND STREET INTERCHANGE PROJECT
2020
- CONTRACT 9578 - ALL BIDS REJECTED 7/30/2020 OAK POINT VICINITY - ROCKFALL PREVENTION
- CONTRACT 9579 - Executed 09/11/2020 HARVARD RD INTERCHANGE IMPROVEMENT
- CONTRACT 9493 - Executed 8/28/2020 PADDEN CREEK FISH PASSAGE
- CONTRACT 9583 - Executed 08/28/2020 EAST OF STEVENS PASS STRATEGIC PAVEMENT PRESERVATION 2020
2019
- CONTRACT 9465 - Executed 7/10/2019I-90 / DANEKAS ROAD UNDERCROSSING - BRIDGE REPAIR
- CONTRACT 9461 - Executed 8/8/2019 WHITE PASS DOMESTIC WATERLINE REPLACEMENT - SCR - RE-AD
- CONTRACT 9464 - Executed 8/8/2019 RIDGEFIELD WEIGH STATION PRESERVATION
- CONTRACT 9463 - Executed 8/13/2019 0.8 MILES W OF SNOQUALMIE SUMMIT EB - CULVERT REPAIR - SMALL WORKS ROSTER
- CONTRACT 9468 - ALL BIDS REJECTED 8/06/2019 2019-21 ER REGIONWIDE BASIC SAFETY SIGNING - SMALL WORKS ROSTER
- CONTRACT 9466 - Executed 9/10/2019 PCC RAILROAD STRUCTURE REHABILITATION AND REPLACEMENT
2018
- CONTRACT 9293 - Executed 8/17/2018 I-205/SR 503, I-205 RAMP METER AND SR 503 VARIABLE MESSAGE SIGN
- CONTRACT 9295 - US 2/I-90, NCR ADA COMPLIANCE 2018
- CONTRACT 9294 - Executed 8/02/2018 US 101, LYNCH ROAD INTERSECTION SAFETY IMPROVEMENTS
- CONTRACT 9292 - Executed 8/06/2018 SR 503, DRAINAGE IMPROVEMENT
- CONTRACT 9296 - Executed 8/13/2018 SR 31, SOUTH OF METALINE STABILIZE SLOPE
- CONTRACT 9244 - ALL BIDS REJECTED 8/7/2018 SR 525, MUKILTEO FERRY TERMINAL (PHASE 2) FERRY TERMINAL CONSTRUCTION
- CONTRACT 9298 - Executed 8/20/2018 SR 21, CURLEW TO CANADA FLOOD REPAIR
2017
- CONTRACT 9124 - Executed 7/28/2017 US 2, DEER RD TO COLBERT CORRIDOR IMPROVEMENTS AND PAVING
- CONTRACT 9126 - Executed 8/14/2017 SELAH CREEK BRIDGE EB - PAVING & BRIDGE JOINT REPAIR
- CONTRACT 9122 - Executed 8/9/2017 HOOD CANAL BRIDGE - REMOVE STEEL BANDS
- CONTRACT 9121 - Executed 8/3/2017 I-90, LACEY V MURROW BRIDGE ELECTRICAL REHABILITATION
- CONTRACT 9123 - Executed 8/17/2017 2017 OLYMPIC REGION GUARDRAIL AND CABLE BARRIER
- CONTRACT 9118 - Executed 8/16/2017 SR 525, MUKILTEO FERRY TERMINAL (PHASE 2) TRESTLE & BRIDGE SEAT CONSTRUCTION
- CONTRACT 9130 - Executed 8/11/2017 SR 105, NORTH COVE VICINITY EROSION PROTECTION 2017
- CONTRACT 9128 - Executed 8/14/2017 SR 112, MP 0.50 TO MP 1.83 SLIDES STABILIZE SLOPES
- CONTRACT 9132 - Executed 8/28/2017 15-17 SCR REGION WIDE SIGNING & INTERSECTION SAFETY - EAST
2016
- CONTRACT 8934 - Executed 8/2/2016 US 12, SCHOUWEILER RD INTERSECTION IMPROVEMENTS
- CONTRACT 8935 - Executed 8/2/2016 NCR STRATEGIC PAVEMENT PRESERVATION 15-17 AREA 1
- CONTRACT 8936 - Executed 7/29/2016 I-5, VICINITY MP 88 SLIDE SLOPE STABILIZATION
- CONTRACT 8939 - Executed 8/10/2016 SR 104, E OF BALMORAL PL NE TO KINGSTON FERRY - PAVING
- CONTRACT 8938 - Executed 8/8/2016 US 395, NSC – WELLESLEY AVE/FREYA ST INTERSECTION IMPROVEMENTS
- CONTRACT 8933 - Executed 8/10/2016 I-5, SWR REGIONWIDE BASIC SAFETY GUARDRAIL (2015 – 2017)
- CONTRACT 8941 - Executed 8/16/2016 SR 305, BAINBRIDGE FERRY TERMINAL SLIP 1 TRANSFER SPAN & TOWERS PAINTING
- CONTRACT 8942 – Executed 8/10/2016 US 2/97, LOWER SUNNYSLOPE ROAD ACCESS CONTROL (SMALL WORKS ROSTER)
- CONTRACT 8946 – Executed 8/15/2016 US 12, W OF PORTER – EMERGENCY SLOPE STABILIZATION - SMALL WORKS ROSTER
- NSC 2016 DEMO NO 3 (SMALL WORKS ROSTER)
- CONTRACT 8944 - Executed 8/18/2016 84TH AVE NE AND 92ND AVE NE ADDED TRUCK APRONS - SMALL WORKS ROSTER
2015
- CONTRACT 8783 - Executed 7/27/15 SR 203 ET AL, NORTHWEST REGION BASIC SAFETY - GUARDRAIL
- CONTRACT 8787 - Executed 7/27/15 I-5, MARTIN WAY TO S. 38TH STREET CONCRETE PANEL REPLACEMENT
- CONTRACT 8784 - Executed 8/17/15 SR 163, TAHLEQUAH FERRY TERMINAL TIMBER FINGER PIER REMOVAL
- CONTRACT 8785 - Executed 7/27/15 US 2 ET AL, ER ADA I/S FEATURES
- CONTRACT 8786 - Executed 7/31/15 I-90, SCR REGION WIDE BASIC SAFETY - GUARDRAIL RE-AD
- CONTRACT 8792 - Executed 7/31/15 SR 7, OHOP VICINITY SLIDE - EMERGENCY SLOPE STABILIZATION
- CONTRACT 8789 - Executed 7/31/15 LOOMIS TRAIL ROAD AND PORTAL WAY ROAD IMPROVEMENTS
- CONTRACT 8788 - Executed 8/24/15 SYSTEMWIDE ON-CALL OFF-SHORE MAINTENANCE
- CONTRACT 8794 - Executed 8/11/15 SPOKANE STREET SHOP BUILDING 02 ROOF - REPLACEMENT
- CONTRACT 8780 - Executed 8/10/15 SR 410, 0.5 MILES E OF CHINOOK PASS EMERGENT NEED WALL REPAIR
- CONTRACT 8796 - Executed 8/20/15 COLFAX MAINTENANCE FACILITY SEPTIC TANK REPLACEMENT
- CONTRACT 8795 - Executed 8/19/15 SR 532, DAVIS SLOUGH BRIDGE REPLACEMENT DUGUALLA BAY MITIGATION SITE
- CONTRACT 8797 - Executed 8/26/15 SR 20 SPUR, LOPEZ FERRY TERMINAL FLOATING WINGWALL REPAIRS
2014
- CONTRACT 8639 - Executed 8/25/14 EDMONDS CITY PARK VICINITY MID BLOCK PEDESTRIAN CROSSING
- CONTRACT 8625 - Executed 8/20/14 SR 520, MONTLAKE TO EVERGREEN PT. BRIDGE - WEST APPROACH BRIDGE NORTH
- CONTRACT 8646 - All Bids Rejected I-82 PROSSER RV DUMP STATION REHABILITATION
- CONTRACT 8647 - Executed 9/2/14 I-90, SPRAGUE LAKE EB RV DUMP STATION REHABILITATION
- CONTRACT 8645 - Executed 9/2/14 I-82 SELAH CREEK EB/WB RV DUMP STATION REHABILITATION
- CONTRACT 8653 - Executed 8/25/14 US 12, 0.80 MILES E CLEAR CREEK FALLS VIEWPOINT - ROCKFALL MESH REPAIR
- CONTRACT 8652 - Executed 8/19/14 DAYTON AVE. BOILER AND CONTROL SYSTEM REPLACEMENT
- CONTRACT 8644 - All Bids Rejected VEHICLE RESERVATIONS PHASE 2 ITS SYSTEMS
2013
- CONTRACT 8502 - Executed 8/13/13 TERMINAL ON-CALL MAINTENANCE PAINTING
- CONTRACT 8499 - Executed 8/1/13 I-5, N FORK LEWIS RIVER BRIDGE NB AND SB PAINTING
- CONTRACT 8501 - Executed 8/5/13 I-5, SR 510 TO SR 512 CONGESTION MANAGEMENT
- CONTRACT 8505 - Executed 8/1/13 WSF, SYSTEMWIDE ON-CALL OFF-SHORE MAINTENANCE
- CONTRACT 8506 - Executed 8/5/13 SR 14, CAPE HORN VIC AND ICE HOUSE LAKE CULVERT REPLACEMENTS
- CONTRACT 8507 - Executed 8/6/13 SR 231, ROSENOFF RD DRAINAGE CULVERT REPLACEMENT
- CONTRACT 8508 - Executed 9/8/13 I-5, SEATTLE AREA BRIDGES - PHASE 2 EXPANSION JOINT REPAIR
- CONTRACT 8510 - Executed 8/26/13 US 97, DRY CREEK W OF ELLENSBURG - CONSTRUCT BRIDGE
- CONTRACT 8511 - Executed 8/23/13 SW REGION AREA 1 HQ BUILDING 4 ROOF RENOVATION
- CONTRACT 8509 - Executed 8/27/13 SR 20, PORT TOWNSEND FERRY TERMINAL PAVEMENT PRESERVATION
2012
- CONTRACT 8335 - Executed 7/30/12 I-90, ASAHEL CURTIS VICINITY EB - CULVERT REPAIR
- CONTRACT 8334 - Executed 7/30/12 SR 507, 8TH AVE S TO 208TH ST E - SAFETY
- CONTRACT 8337 - Executed 8/13/12 SR 20 SPUR, FRIDAY HARBOR FERRY TERMINAL PHYSICAL SECURITY INFRASTRUCTURE
- CONTRACT 8333 - Executed 8/9/12 SR 20, PORT TOWNSEND FERRY TERMINAL SLIP 1 TRANSFER SPAN REPLACEMENT
- CONTRACT 8338 - Executed 8/6/12 I-90/SR 28 - NCR MAJOR ELECTRICAL 2012
- CONTRACT 8343 - Executed 8/7/12 US 2, SR 20, US 97 - NCR ROADSIDE IMPROVEMENTS CURVE SIGNAGE UPDATE
- CONTRACT 8341 - Executed 8/3/12 EASTERN REGION ADA COMPLIANCE - UPDATE REDESTRIANS I/S FEATURES
- CONTRACT 8357 - Executed 7/13/12 FAUNTLEROY FERRY TERMINAL EMERGENCY TRESTLE REPAIRS
- CONTRACT 8339 - Executed 8/13/12 SR 20, ORCAS FERRY TERMINAL TRANSFER SPAN REPAIRS
- CONTRACT 8340 - Executed 8/10/12 SR 519 SEATTLE FERRY TERMINAL TIMBER TRESTLE PRESERVATION
- CONTRACT 8348 - US 2 ET AL, STATEWIDE DURABLE STRIPING
- CONTRACT 8350 - Executed 8/13/12 US 2, INTERSECTION IMPROVEMENTS AT PESHASTIN
- CONTRACT 8346 - Executed 8/20/12 I-90, S CLE ELUM RD BRIDGE EB - APPROACH SLAB REPAIR
- CONTRACT 8344 - Executed 8/10/12 US 101, MIDDLE NEMAH RIVER BR. REPLACE BRIDGE
- CONTRACT 8351 - Executed 8/29/12 SR 906 TRAVELERS REST BUILDING RENOVATION
- CONTRACT 8349 - Executed 8/21/12 SR 104 & SR 519, SR 104/EDMONDS FERRY TERMINAL & SR 519/SEATTLE FERRY TML - SLIP 1 OHL PLC/ELECTRICAL UPGRADE
- CONTRACT 8342 - Executed 8/22/12 SR 21, S NANAMKIN CREEK - CULVERT REPLACEMENT
2011
- CONTRACT 8183 - Executed 8/2/11 US 97 ET AL, YAKIMA AND BENTON COUNTY BRIDGE - SCOUR REPAIR
- CONTRACT 8184 - Executed 8/5/11 SR 9, 212TH ST SE TO 176TH ST SE STAGE 3 WETLAND MITIGATION
- CONTRACT 8187 - Executed 8/1/11 WSF, TERMINAL ON-CALL MAINTENANCE PAINTING
- CONTRACT 8191 - Executed 7/25/11 2011 OLYMPIC REGION CENTERLINE RUMBLE STRIPS - SAFETY
- CONTRACT 8188 - Executed 8/5/11 CHEHALIS MAINTENANCE FACILITY AREA 2 OFFICE FLOOR MOISTURE REMEDIATION
- CONTRACT 8193 - Executed 8/18/11 WALLA WALLA TO DAYTON BRIDGE & TIE REHABILITATION
- METHOW VALLEY STATE AIRPORT - 2011 AIRPORT IMPROVEMENTS PROJECT
- CONTRACT 8197 - Executed 8/24/11 PORT ANGELES SIGNALS MAJOR ELECTRICAL
- CONTRACT 8201 - Executed 8/16/11 SR 106 TO SR 300 PAVING
- CONTRACT 8127 - Executed 8/19/11 SNOWSHED TO KEECHELUS DAM PHASE 1C - REPLACE SNOWSHED AND ADD LANES
- CONTRACT 8190 - Executed 8/23/11 HCB UN ANCHOR CABLE AND HATCH DOG REPAIR
- CONTRACT 8203 - Executed 9/20/11 LOST LAKE RD BRIDGE - SEISMIC RETROFIT
2010
- CONTRACT 7958 Executed 7/29/10 SR 28, EAST WENATCHEE TO ROCK ISLAND PAVING
- CONTRACT 7964 Executed 7/12/10 WSF, MUKILTEO FERRY TERMINAL FLOATING DOLPHIN PRESERVATION
- CONTRACT 7970 HYAK PRE-WASH BAY
- CONTRACT 7974 Executed 7/30/10 I-5, TACOMA HOV MITIGATION
- CONTRACT 7978 Executed 7/29/10 SR 20, WAUCONDA SUMMIT EAST PAVEMENT REPAIR
- CONTRACT 7975 Executed 7/26/10 2010 OLYMPIC REGION CENTERLINE RUMBLE STRIPS SAFETY
- CONTRACT 7962 Executed 9/7/10 DOWNTOWN BELLINGHAM ON/OFF RAMPS RAMP RECONSTRUCTION
- CONTRACT 7980 Executed 8/3/10 SR 532, PIONEER HIGHWAY TO 72ND AVE NW SIDEWALK
- E 2ND AVENUE DEMO 2010
- CONTRACT 7979 Executed 8/19/10 WSF, SYSTEMWIDE COUNTERWEIGHT CABLE REPLACEMENT
- CONTRACT 7969 VERNITA SAFETY REST AREA BUILDING REPLACEMENT
- CONTRACT 7967 US 395, NSC - FREYA ST TO FARWEEL RD - SB ADDITIONAL LANES - REBID
- CONTRACT 7976 US 2, EUCLID AVE TO FRANCIS AVE PAVING - REBID
- CONTRACT 7973 Executed 8/16/10 SR 432, 38TH AVENUE SIGNAL REPLACEMENT
- CONTRACT 7977 Executed 10/14/10 SR 14, CAPE HORN BR. VIC TO CAPE HORN RD. SAFETY IMPROVEMENTS
- CONTRACT 7971 Executed 8/18/10 I-90, LAKE EASTON VIC TO BIG CREEK BR VIC EB - REPLACE/REHAB CONCRETE
- US 395, WEST OF FREYA DEMO 2010
2009
- CONTRACT 7785 Executed 7/23/09 PCCR PV HOOPER BRANCH REHABILITATION
- CONTRACT 7784 Executed 7/20/09 US 101, MOSQUITO CREEK FISH PASSAGE
- An American Recovery and Reinvestment Act project
CONTRACT 7779 Executed 7/23/09 I-5, PORT OF TACOMA ROAD TO KING COUNTY LINE - HOV - CONTRACT 7789 Executed 8/3/09 US 97, BLEWETT PASS VICINITY EMERGENCY FLOOD REPAIR STAGE 3
- An American Recovery and Reinvestment Act project
CONTRACT 7787 Executed 8/4/09 I-90, MOSES LAKE PAVING - CONTRACT 7786 Executed 8/11/09 I-90, HIGH POINT TO PRESTON PEDESTRIAN AND BICYCLE TRAIL
- An American Recovery and Reinvestment Act project
CONTRACT 7791 Executed 8/7/09 I-5 ET AL, WESTERN WASHINGTON CABLE BARRIER - An American Recovery and Reinvestment Act project
CONTRACT 7793 Executed 8/11/09 SR 9 ET AL, NORTHWEST REGION CENTERLINE RUMBLE STRIPS - An American Recovery and Reinvestment Act project
CONTRACT 7792 SR 7 ET AL WESTERN WASHINGTON CENTERLINE RUMBLE STRIPS - CONTRACT 7797 Executed 8/10/09 US 12, 1.4 MILES WEST OF WHITE PASS EMERGENT SLOPE FAILURE
- CONTRACT 7788 Executed 8/4/09 SR 108, SLIDE REPAIR 0.8 MILES W. OF EICH RD. - UNSTABLE SLOPE
- CONTRACT 7790 Executed 8/17/09 US 2 ET AL, EASTERN WASHINGTON CENTERLINE RUMBLE STRIPS
- CONTRACT 7795 Executed 8/17/09 I-90, THORP VIC. AND MOSES LAKE CABLE BARRIER
- CONTRACT 7794 Executed 8/17/09 I-5, I-205 JCT. TO DIKE RD. CABLE BARRIER
- CONTRACT 7798 Executed 8/24/09 I-5, 5TH AVE NE TO NE 92ND ST NOISE WALL - STAGE 2
- CONTRACT 7777 Executed 8/17/09 US 395, NSC - US 2 TO WANDERMERE VICINITY
2008
- CONTRACT 7581 Executed 7/28/08 P & L BRANCH REHABILITATION
- CONTRACT 7582 Executed 7/23/08 ONE MILE EAST OF INDEX SLOPE STABILIZATION
- CONTRACT 7566 Executed 7/28/08 SR 16 TO BLACKJACK CREEK PAVING & SIGNAL
- CONTRACT 7575 Executed 7/28/08 SR 99 ALASKAN WAY VIADUCT-REPLACEMENT S MASS TO RR WAYS ELEC LINE RELOC
- CONTRACT 7579 Executed 7/30/08 I-90 HOMER M HADLEY BRIDGE SPECIAL BRDIGE REPAIR
- CONTRACT 7583 Executed 7/30/08 PV HOOPER BRANCH REHABILITATION
- CONTRACT 7584 Executed 8/12/08 I-5, MCALLISTER CREEK BRIDGE REPAIR
- CONTRACT 7586 Executed 8/07/08 I-5, WBNV-PRE CN SANITARY SEWER RELOCATE VIC. S. TACOMA WAY & S. HOSMER ST
- CONTRACT 7590 Executed 8/12/08 US 101, HOLIDAY HILLS EMERGENCY SLIDE REPAIR UNSTABLE SLOPE
- CONTRACT 7598, Executed 8/12/08 SR 509, D. STREET POND RECONSTRUCTION
- CONTRACT 7588, Executed 8/19/08 SR 16 NEW TACOMA NARROWS BRIDGE EXPANSION JOINT NOISE MITIGATION
- CONTRACT 7587, Executed 8/13/08 SR 6, SO. FORK CHEHALIS RIVER BRIDGE
- CONTRACT 7585, Bids Rejected 8/4/08 WSF, SEATTLE FERRY TERMINAL TIMBER TRESTLE PRESERVATION
- CONTRACT 7592, Executed 8/13/08 NORTH OF ALDER UNSTABLE SLOPE
2007
- CONTRACT 7378 Executed 8/28/07 US 12 ET AL, BRIDGE RAIL RETROFIT
- CONTRACT 7382 Executed 8/7/07 US 2, FERN BLUFF RD TO SULTAN STARTUP RD VIC & 10TH ST DRAINAGE IMPROVEMENTS
- CONTRACT 7384 All bid rejected 7/23/07 I-5, 36TH ST VIC TO SLATER RD VIC
- CONTRACT 7388 Executed 8/13/07 SR 161, JOVITA BLVD TO S 360TH ST EMBANKMENT REPAIR
- CONTRACT 7381 WSF, SYSTEMWIDE ON CALL WINGWALL AND DOLPHIN REPAIR
- CONTRACT 7391 Executed 8/16/07 I-90, LATAH CREEK AND LINDEKE ST BRDIGES UPGRADE BRIDGE RAIL
- CONTRACT 7392 Executed 8/20/07 SR 16, UNIVERSITY PLACE STORMWATER MITIGATION
- CONTRACT 7390 Executed 8/28/07 I-5/SR 512, TRAFFIC MAP EXPANSION
- CONTRACT 7389 WSF, POST EFS PORT TOWNSEND/KEYSTONE PROJECT
2006
- CONTRACT 7188 WSF, CLINTON FERRY TERMINAL UTILITY REPAIRS
- CONTRACT 7182 Executed 8/14/06--I-5, MCALLISTER CREEK BRIDGE REPAIR
- CONTRACT 7187 Executed 8/6/06--I-90, RYEGRASS HILL - PAVING
- CONTRACT 7177 Executed 7/24/06--US 395, NSC FRANCIS AVE TO US 2 STRUCTURES REBID
- CONTRACT 7186 Executed 8/31/06--SR 18, I-5 TO MAPLE VALLEY I/C INTELL TRANS SYSTEM- STAGE 1
- CONTRACT 7194 Executed 8/18/06--I-5, NISQUALLY VALLEY ICE WARNING SYSTEM
- CONTRACT 7193 Executed 8/11/06--US 101, 5 MILES SOUTH OF ARTIC UNSTABLE SLOPE
2005
- CONTRACT 7008 Executed 8/30/05--I-182, QUEENSGATE/THAYER I/C-IMPROVEMENTS
- CONTRACT 7011 Executed 8/8/05--WSF, BREMERTON FERRY TERMINAL-PAVEMENT REPAIR AND CRACK SEAL
- CONTRACT 7013 Executed 8/1/05--WSF,EAGLE HARBOR MAINTENANCE FACILITY SLIP B
- CONTRACT 7012 Executed 8/8/05--WSF, KINGSTON FERRY TERMINAL TOLL BOOTH REPLACEMENT PROJECT
- CONTRACT 6994 Executed 8/8/05--SR 9, SR522 TO 212TH ST SE WIDENING
- CONTRACT 7014 Executed 8/5/05--SR 206, SR206/BRUCE ROAD I/S ROUNDABOUT
- CONTRACT 7020 Executed 8/11/05--I-5, 96TH STREET TO 56TH STREET CONCRETE PANEL REPLACEMENT - PAVING
- CONTRACT 7010 Executed 8/10/05--SR 202, SR 520 TO SAHALEE WAY STAGE 2 WETLAND MITIGATION SITE #2
- CONTRACT 7016 Executed 8/23/05--WSF, SYSTEMWIDE FERRY TERMINAL-HYDRAULIC AND CONTROL UPGRADE PHASE 2
- CONTRACT 7017 Executed 8/19/05--WSF, SYSTEMWIDE ON-CALL WINGWALL AND DOLPHIN REPAIR
- CONTRACT 7015 Executed 10/17/05--SR 7, SR 507 TO SR 512-SAFETY
2004
- CONTRACT 6818 Executed 8/2/04--I-90, SUNSET I/C MODIFICATIONS ROADSIDE RESTORATION
- CONTRACT 6823 Executed 7/26/04--I-5, PACIFIC AVE TO KING COUNTY LINE FIBER OPTIC SYSTEM
- CONTRACT 6822 Executed 7/30/04--SR 543, I-5 TO INTERNATIONAL BNDY TEST SHAFTS
- CONTRACT 6821 Executed 7/28/04--SR 542, COAL CREEK VIC TO EXCELSIOR TRAIL GUARDRAIL INSTALLATION
- CONTRACT 6825 Executed 8/23/04--I-90, DODSON RD. VARIABLE MESSAGE SIGN
- CONTRACT 6827 Executed 8/31/04--SR 4, SLIDE REPAIR KM MOUNTAIN
- CONTRACT 6828 Executed 8/23/04--SR 409, FERRY DOCK TO SR 4
- CONTRACT 6829 Executed 8/16/04--SR 21, SR 25/231 GUARDRAIL IMPROVEMENTS & EASTERN REGION SAFETY RESTORATION
- CONTRACT 6831 Executed 8/24/04--WSF, ANACORTES FERRY TERMINAL UPLAND PARKING LOT IMPROVEMENTS AND TRAIL PROJECT
- CONTRACT 6830 Executed 8/23/04--US 101, FRANCIS ST TO ALDER ST. - PAVEMENT REPAIR
- CONTRACT 6833 Executed 8/19/04--TUMWATER MATERIALS LAB EXTERIOR RENOVATIONS
2003
- CONTRACT 6620 Executed 7/30/03--I-90, ARGONNE RD. TO SULLIVAN RD.
("IT'S YOUR NICKEL, WATCH IT WORK") - CONTRACT 6629 Executed 7/30/03--SR 531, 11TH AVE. NE TO 16TH DR. NE VIC.
- CONTRACT 6626 Executed 8/6/03--US 101, HOQUIAM RIVER BRIDGES-SEISMIC RETROFIT
- CONTRACT 6625 Executed 8/11/03--SR 500, N.E. 112TH AVE./GHER RD. INTERCHANGE
("IT'S YOUR NICKEL, WATCH IT WORK") - CONTRACT 6633 SR 904, HES SAFETY IMPROVEMENTS
- CONTRACT 6628 Executed 8/18/03--SR18, EB OFF RAMP TO WEYERHAEUSER WAY AND WEYERHAEUSER WAY TO SR 167
- CONTRACT 6636 Executed 8/11/03--SR 203, MORRISON ST TO NE 55TH ST PEDESTRIAN SAFETY
- CONTRACT 6634 Executed 8/6/03--SPOKANE HQ SITE RENOVATIONS
- CONTRACT 6635 Executed 8/18/03--SR 162, VOIGHTS CR. BR. VICINITY
- CONTRACT 6637 Executed 9/8/03--I-90, HIGHLINE CANAL TO ELK HEIGHTS
("IT'S YOUR NICKEL, WATCH IT WORK") - CONTRACT 6639 Executed 8/25/03--I-182, US 395 I/C-ROADSIDE SAFETY
("IT'S YOUR NICKEL, WATCH IT WORK") - CONTRACT 6630 Executed 8/18/03--I-90, RYEGRASS SUMMIT TO VANTAGE
("IT'S YOUR NICKEL, WATCH IT WORK") - CONTRACT 6611 Executed 9/02/03--SR 18, MAPLE VALLEY TO ISSAQUAH/HOBART RD.
2002
- CONTRACT 6414 Executed 7/19/02-- SR 4, GERMANY CREEK ROCKFALL STABILIZATION
- CONTRACT 6410 All bids rejected--SR 165, CARBON RIVER BRIDGE VIC CRIB WALL REPAIR
- CONTRACT 6417 Executed 8/06/2002 US 12, MP 89 SLIDE REPAIR
- CONTRACT 6413 Executed 8/06/2002 I-5, FEDERAL WAY NB WEIGH STATION WEIGH IN MOTION
- CONTRACT 6416 Executed 8/13/2002 US 395, HILLSBORO STREET INTERCHANGE
- CONTRACT 6421 Executed 8/23/2002 SR 3, VIC FALKNER RD - UNSTABLE SLOPE
- CONTRACT 6419 Executed 8/23/2002 I-90, INDIAN JOHN HILL REST AREA - PAVING
- CONTRACT 6441 TACOMA NARROWS BRIDGE
2001
- Contract 6181 executed 7/30/01- SR 410 SR 167 TO LINDEN DR
- Contract 6182 executed 7/27/01- SR 405 BOTHELL TO SWAMP CREEK STAGE 1 ROADSIDE RESTORATION
- Contract 6186 executed 7/31/01- SR 12 BLACK RIVER BRIDGE 12/76 SCOUR PROTECTION
- Contract 6175 executed 8/7/01- SR 99 62ND AVE E TO KING COUNTY LINE
- Contract 6194 executed 7/24/01- SR 3 SWEETWATER CREEK CULVERT REPLACEMENT
- Contract 6184 executed 7/24/01- SR 307 GUNDERSON, STOTTLEMEYER AND ROVA ROAD REALIGNMENT
- Contract 6190 executed 8/4/01- SR 125 PINE STREET TO MAY AVENUE
- Contract 6179 executed 8/6/01- SR 2, SR 9 INTERCHANGE TO SR 522
- Contract 6178 executed 8/8/01- SR 20 ANACORTES FERRY TERMINAL, SLIP 2 REFURBISHMENT, SLIPS 1 & 2 DOLPHINS
- Contract 6188 executed 8/13/01- SR 90 & 405 INTERSTATE 90 BRIDGES-STAGE 2 RENTON TO KIRKLAND BRIDGES-SEISMIC
- Contract 6187 executed 8/7/01- SR 2 WALLACE RIVER BR TO PROCTOR CREEK BR
- Contract 6189 executed 8/7/01- SR 405&520, BRIDGES 405/47S-W, 405/50N&S, 405/57N&S, AND 520/10 SEISMIC RETROFIT
- Contract 6203 executed 8/13/01- SR 99 1ST AVE S BRIDGE, BRIDGE REPAIR NISQUALLY EARTHQUAKE
- Contract 6208 All bids rejected- SR 125 & 11, STATE LINE INTERSECTION -
- Contract 6201 executed 8/7/01- SR 5 BLAINE VIC RAMPS & NB PACE LANE, ROADSIDE RESTORATION
- Contract 6204 executed 8/6/0- SR 516 SE WAX ROAD TO CEDAR HEIGHTS JHS AND JCT. 192ND AVE. SE1
- Contract 6193 executed 8/4/01- SR 105 & A05 SPUR, BONGE AVE. TO WESTHAVEN
- Contract 6210 executed 8/13/01- SR 303 RIDDELL RD. TO MP 5.30
- Contract 6185 executed 9/10/01- SR 99 SHORELINE PEDESTRIAN SAFETY DEMONSTRATION PROJECT
- Contract 6200 executed 8/17/01- SR 5, 164TH ST SW TO SR 526, ROADSIDE RESTORATION
- Contract 6206 executed 8/23/01- SR 527, 144TH ST SE TO 16TH AVE SE WALL CONSTRUCTION
- Contract 6205 executed 8/16/01- SR 520, 104TH AVE NE TO W LAKE SAMMAMISH PKW ROADSIDE RESTORATION
- Contract 6196 -All bids rejected 8/21/01- SR 5, HOLGATE TO 8TH AVE VICINITY SEISMIC RETROFIT
- Contract 6207 executed 8/16/01- SR 97, TOPPENISH CREEK VICINITY AND TOPPENISH CREEK BR. 97/116
- Contract 6209 executed 8/14/01- SR 525 CAMERON ROAD TO SR 20 STAGE 4 - SECTION 2
- Contract 6215 executed 8/21/2001- SR 507, MP 27.96 TO BALD HILLS ROAD-PAVEMENT REPAIR
- Contract 6145 executed 8/14/01- SR 405, SR 167 I/C MODIFICATION
2000
- CONTRACT 5891 SR 16 JACKSON AVE. I/C TO TACOMA NARROWS BRIDGE WEST APPROACH
- CONTRACT 5904 GARDINER TO WEST UNCAS ROAD VIC.
- CONTRACT 5905 VICINITY MP 90.1 DEBRIS CHANNEL STRUCTURE
- CONTRACT 5906 GOLD CREEK TO EASTON HILL
- CONTRACT 5908 SR 542 TO SOUTHPASS RD VIC
- CONTRACT 5909 SR 5 TO VIC. SR 7 I/C
- CONTRACT 5910 SR 278 & 395 2000 EASTERN REGION SCOUR REPAIR
- CONTRACT 5911 WSP DETACHMENT OFFICE ADDITION AT NASELLE SECTION FACILITY
- CONTRACT 5913 JCT. KELLY ROAD
- CONTRACT 5914 I-82 TO BENTON CITY
- CONTRACT 5915 BOGACHIEL VIC. SLIDE
- CONTRACT 5916 ROSS POINT VIC. SLIDE REPAIR - PHASE 2
- CONTRACT 5917 SR 90 RURAL INTERSTATE RUMBLE STRIPS
- CONTRACT 5918 SEATTLE FERRY TERMINAL COLMAN DOCK OFFICE TENANT IMPROVEMENTS
- CONTRACT 5924 SR 270 PULLMAN TO IDAHO STATE LINE
- CONTRACT 5925 SR 505 RAILROAD CROSSING AT WINLOCK
- CONTRACT 5926 SR 5 STANWOOD/BRYANT SIGNING & PAVEMENT GRINDING
- CONTRACT 5927 HOLDER CREEK VICINITY SLOPE STABILIZATION
- CONTRACT 5928 SR 525 OLD STATE HIGHWAY VICINITY
- CONTRACT 5929 YAKIMA & NACHES RIVER BRIDGES 82/114 S & N AND 82/115 S & N
- CONTRACT 5930 SR 9 NOOKACHAMPS CREEK BRIDGE NO. 9/208 SCOUR REPAIR
- CONTRACT 5931 220TH ST SW & NORTHGATE WAY OFF RAMP MODIFICATIONS
- CONTRACT 5932 SR 106 TO MP 26.70
- CONTRACT 5933 CLE ELUM SAND STORAGE
- CONTRACT 5934 MONROE SERVICE AND STORAGE BUILDING ROOF REPAIR PROJECT
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.