US 395 – Division Wye to Wandermere – Paving – Complete Streets

Project overview

US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required implementation of the Complete Streets requirement for the full length of the project corridor.

Timeline
Spring 2023 - Summer 2027
Project status
Pre-construction
Funding
$14.9 Million
Project hotline

What to expect

This project is currently in the pre-design phase to identify, select, and begin the design of the necessary Complete Streets strategies to implement as part of a paving project for this corridor. The addition of Complete Streets strategies to the paving project aims to improve the active transportation environment along and across the project corridor. 

Pre-design is expected to be completed in the spring of 2025, with full design staring in July of 2025. This project will be delivered using the Design-Bid-Build process, with construction anticipated to begin in the summer of 2026. This schedule is preliminary and may change depending on the results of the pre-design phase.

Upcoming Engagement Opportunities

The project team has developed strategies to improve walking, bicycling, and rolling for along and across the project corridor based on an analysis of existing conditions, community input, and WSDOT standards. WSDOT held an open house to showcase the strategies on April 2, 2025, both in-person and virtually. Project design information and strategies can be found on the Maps & drawings tab, which was updated for the open house and contains a link to view the boards presented and links to comment forms to provide feedback.

For more details on Complete Streets and other general questions, please refer to the FAQs under the Related Links tab. A general online comment card also remains available to provide input to the project team at any time for the remainder of the project.

Project map location for the US 395 - Division Wye to Wandermere Road - Paving and Complete Streets project in Spokane County.