October bid tabulations
A record of the engineer's estimate and bid amount for each project, by bid item and contractor for the month of October.
2024
- Contract XE3573 - SR 20 Spur, Shaw Ferry Terminal - Trestle Repair (PDF 57KB)
- Contract XE3572 - US 395 / NSC 2024 Demo No 2 (PDF 62KB)
- Contract XE3569 - SR 503/Pedestrian Signal Prairie High School Vicinity (PDF 163KB)
- Contract QR4271 - SR 171, Moses Lake - RRFB Retrofit to Mast Arm (PDF 141KB)
2023
No bid tabulations
2022
- Contract 9881 - Executed 11/30/2022 Aberdeen/Westport Signals and ADA (PDF 152KB)
- Contract 9884 - Executed 11/30/2022 OR Breakaway Cable Terminal Replacement - Freeways (PDF 157KB)
- Contract 9880 - Executed 11/22/2022 68th Ave S Vicinity Pedestrian Safety (PDF 247KB)
- Contract 9873 - Executed 11/30/2022 Anacortes Ferry Terminal Tollbooth Replacement (PDF 167KB)
- Contract 9872 - Executed 11/30/2022 Barnes Creek Fish Passage (PDF 294KB)
2021
- CONTRACT 9724 - All Bids Rejected 10/14/2021 I-205 TO SE 164TH AVENUE AUXILIARY LANES (PDF 199KB)
- CONTRACT 9728 - Executed 12/07/2021 FREEWAY / ARTERIAL INTEGRATED CORRIDOR MANAGEMENT 2019-2021 (PDF 142KB)
- CONTRACT 9735 - Executed 12/13/2021 SR 167 COMPLETION DEMO 8 (SMALL WORKS ROSTER) (PDF122KB)
- CONTRACT 9729 - Executed 11/17/2021 EMBANKMENT EROSION REPAIR (SMALL WORKS ROSTER) (PDF 139KB)
- CONTRACT 21A824 - Executed 10/28/2021 SR 204 INTERSECTION IMPROVEMENTS DEMO 1 (SMALL WORKS ROSTER) (PDF 120KB)
2020
- CONTRACT 9587 - Executed 12/02/2020 NSC SPOKANE RIVER TO COLUMBIA
- CONTRACT 9595 - Executed 11/24/2020 MORSE CREEK VICINITY SAFETY IMPROVEMENTS
- CONTRACT 9598 - Executed 11/24/2020 SPOKANE PORT OF ENTRY WEIGH STATION SCALE PIT REPAIRS
- CONTRACT 9597 - Executed 11/06/2020 SR 516 VIC TO S 204TH - DEMO #3 (SMALL WORKS ROSTER)
- CONTRACT 9594 - Executed 11/06/2020 MCELROY COULEE CROSSING REPLACE DRAINAGE STRUCTURE
2018
- CONTRACT 9319 - Executed 11/19/2018 I-90 468TH AVE SE TO W SUMMIT RD WB REHAB CONCRETE
- CONTRACT 9318 - Executed 11/30/2018 - FERRY DOCK RD - PASSENGER DROP-OFF & ADA IMPROVEMENT
- S52 AIP 009 - METHOW VALLEY STATE AIRPORT WEST GENERAL AVIATION APRON EXPANSION
2017
- CONTRACT 9154 - Executed 10/25/2017 SR 26, SR 26 & US 195 SAFETY IMPROVEMENTS (Small Works Roster)
- CONTRACT 9147 - Executed 11/15/2017 I-5, S 188TH ST TO NE 80TH ST CAMERA INSTALLATION (Small Work Roster)
- CONTRACT 9144 - Executed 11/21/2017 I-5 ET AL, NWR CABLE BARRIER UPGRADE
- CONTRACT 9161 - Executed 11/13/2017 I-5, LAKE SAMISH VIC STORMWATER PIPE REPLACEMENT
- CONTRACT 9156 - Executed 11/13/2017 SR 522, ELLIOTT ROAD VIC SANDFILTER
- CONTRACT 9151 - Executed 11/20/2017 I-90, FLOATING BRIDGES REPLACE ANCHOR CABLES
- CONTRACT 9155 - Executed 11/20/2017 US 12, US 101 & SR 109. ABERDEEN/HOQUIAM SIGNALS REBUILD SIGNALS
- CONTRACT 9150 - Executed 11/22/2017 SR 525, MUKILTEO FERRY TERMINAL (PHASE 2) DEEP STORMWATER UTILITY CONSTRUCTION
2016
- CONTRACT 8967 - Executed 10/27/16 SR520/SR202, EMERGENCY TREE REMOVAL(Small Works Roster)
- CONTRACT 8969 - Executed 10/19/2016 SR 18, GREEN RIVER BRIDGE VIC EMERGENCY SLIDE REPAIR
- CONTRACT 8970 – Executed 11/9/2016 15-17 OR REGION WIDE I/S IMPLEMENTATION PROGRAM & BASIC SAFETY – SIGNING
- CONTRACT 8974 – Executed 11/9/2016 I-5 & SR 503, INTERSECTION IMPROVEMENTS
- CONTRACT 8972 – Executed 12/2/2016 PCC RAILROAD REHABILITATION P&L BRANCH/WIM BRANCH
- CONTRACT 8968 – Executed 11/17/2016 SR 104, HOOD CANAL BRIDGE SPECIAL REPAIR – GEAR BOX
2015
- CONTRACT 8807 - Executed 11/13/15 SR 9 ET AL, WHATCOM COUNTY BST
- CONTRACT 8808 - Executed 11/17/15 SR 9 ET AL, MT BAKER AREA BST 2016
- CONTRACT 8810 - Executed 11/13/15 I-5, BIRCH BAY LYNDEN RD BRIDGE-BRIDGE REPAIR
- CONTRACT 8813 - Executed 11/24/15 FRONT STREET BRIDGE 90/66S GIRDER REPLACEMENT
2014
- CONTRACT 8667 - Executed 10/29/14 SR 305, BAINBRIDGE FERRY TERMINAL SLIP MAINTENANCE REPAIRS
- CONTRACT 8668 - Executed 10/31/14 OR REGION WIDE BASIC SAFETY GUARDRAIL & SIGNING
- CONTRACT 8666 - Executed 10/31/14 MT. BAKER TUNNEL OPERATIONS BUILDING HVAC
- CONTRACT 8672 - Executed 10/23/14 US 12, EAST OF CLEAR CREEK FALLS VIEWPOINT CULVERT REINFORCEMENT
- CONTRACT 8662 - Executed 12/3/14 I-90, TWO-WAY TRANSIT & HOV OPERATIONS STAGE 3
- US 395, NSC 2014 DEMO NO 3
2013
- CONTRACT 8533 - Executed 11/12/13 SR 20 SPUR, LOPEZ ISLAND FERRY TERMINAL UPLAND ADA COMPLIANCE IMPROVEMENTS
- CONTRACT 8532 - All Bids Rejected 10/24/13 I-5, SR 18 I/C TO S 288TH ST SEISMIC RETROFIT
- US 395, NSC 2013 DEMO NO 2
- CONTRACT 8539 - Executed 11/20/13 SR 904, BETZ RD TO I-90 - PAVING
- CONTRACT 8541 - Executed 12/5/13 SR 104, EDMONDS FERRY TERMINAL ENTRY REPLACEMENT
2012
- CONTRACT 8372, Executed 11/6/12 PCC RAILROAD REHABILITATION CW LINE
- CONTRACT 8375, Executed 11/28/12 SR 24, S OF OTHELLO SAGEHILL WASTEWAY DECK REPAIR
- Executed 11/2/12 US 395, SOUTHSIDE OF I-90 DEMO NO. 8
- CONTRACT 8377 - Executed 12/3/12 SR 20, SNC RAILROAD BRIDGE SEISMIC RETROFIT
- CONTRACT 8374 - Executed 11/30/12 SR 20 SPUR, FRIDAY HARBOR TERMINAL PEDESTRIAN & SAFETY IMPROVEMENT
- CONTRACT 8380 - Executed 11/28/12 SR 16, TACOMA NARROWS BRIDGE SPECIAL REPAIR
2011
- Executed 10/18/11 MARKET STREET COMMERCIAL DEMO NO. 2
- CONTRACT 8220 - Executed 11/23/11 SR 16, OLYMPIC DRIVE NW BRIDGE - SPECIAL REPAIR
- CONTRACT 8224 - Executed 11/18/11 SEA-TAC REST AREA STAIRS & RAMP REPLACEMENT
- CONTRACT 8218 - Executed 11/23/11 SR 167, 24TH ST E BRIDGE SPECIAL REPAIR
- NORTH OF RIVER COMMERCIAL AND RESIDENTIAL DEMO NO. 3
2010
- CONTRACT 8032 Executed 10/29/10 US 101, SIMPSON AVE. BRIDGE PIER REPAIRS
- CONTRACT 8005 Executed 11/2/10 OLYMPIC REGION BASIC SAFETY RESTORATION 2010
- CONTRACT 8013 Executed 10/28/10 SR 26, GRANT COUNTY LINE TO SR 17 PAVING
- CONTRACT 8007 Executed 11/9/10 SR 302, KEY PENINSULA HWY TO PURDY VIC SAFETY AND CONGESTION - STAGE 1
- CONTRACT 8008 Executed 11/9/10 I-205/I-5 CLARK COUNTY RAMP PAVING
- CONTRACT 8019 Executed 11/10/10 WSF, MUKILTEO FERRY TERMINAL TRANSFER SPAN MECHANICAL AND ELECTRICAL
- CONTRACT 8010 Executed 11/1/10 SR 532, NORTH LEQUE ISLAND SLOPE PROTECTION
- CONTRACT 8025 Executed 11/16/10 MOTTMAN MODULAR RE-ROOF AND HVAC RENOVATION
- CONTRACT 8015 Executed 12/1/10 EASTERN REGION CHIP SEAL 2010 - HMA CONVERSIONS
- CONTRACT 7963 Executed 11/29/10 EASTSIDE TRANSIT AND HOV DESIGN-BUILD
- CONTRACT 8020 Executed 11/15/10 WSF, ANACORTES FERRY TERMINAL OVERHEAD LOADING REHABILITATION
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED INCLUDES WSU STUDENT BIDS
- CONTRACT 8024 Executed 11/16/10 NCR TRAFFIC CONTROLLER REPLACEMENT 2011
- CONTRACT 8017 Executed 11/12/10 US 395, LEE RD TO VIC JCT I-90 PAVING
- CONTRACT 8018 Executed 11/22/10 I-90, VIC GEIGER RD TO SPOKANE VIADUCT PCCP REHAB
- CONTRACT 8023 Executed 11/3/10 I-90, WB ALTAMONT VARIABLE MESSAGE SIGN REPLACEMENT
- CONTRACT 8026 SR 21, 1.4 MILES N OF MANILA CR RD - SLOPE STABILIZATION
- SR 31, PEND OREILLE COUNTY - WATERLINE REPLACEMENT
2009
- CONTRACT 7819 Executed 10/21/09 US 97A NORTH OF WENATCHEE SLOPE STABILIZATION
- 2009 ER DEMOLITION NO. 3
- CONTRACT 7828 Executed 11/16/09 HAVANA STREET OVERCROSSING - PHASE 1
- CONTRACT 7832 Executed 11/2/09 SR 28 & US 2/97, INTERSECTION IMPROVEMENTS BOX CULVERT INSTALLATION
- CONTRACT 7834 Executed 11/8/09 SR 8, ELMA TO US 101 - CABLE BARRIER
- CONTRACT 7831 Executed 11/13/2009 WSF, SEATTLE FERRY TERMINAL SLIP 2 LOADING DECKING REPLACEMENT
- CONTRACT RW 4997 REPUBLIC DEMOLITION
- CONTRACT 7822 Executed 11/23/09 I-5, MARTIN WAY TO 48TH ST - NB & SB CONCRETE PAVEMENT REHABILITATION
- CONTRACT 7830 Executed 11/23/09 SR 16, UNION AVE TO JACKSON AVE ROADSIDE RESTORATION
2008
- CONTRACT 7594 Executed 10/21/08 I-5/SR16, WESTBOUND NALLEY VALLEY I/C
- CONTRACT 7615 Executed 10/29/087 ORONDO MAINTENANCE FACILITY BUILDING ADDITION
- CONTRACT RW-4662 2008 ER DEMOLITION NO 2
- CONTRACT 7616 Executed 11/16/08 SR 26, PALOUSE RIVR BR-DECK REPAIR
- CONTRACT 7609, Executed 11/13/09 WSF, EDMOND FERRY TERMINAL UNOCAL PIER REMOVAL
- CONTRACT SR 20, HADLEY ROAD VICINITY WASHOUT EMERGENCY CONTRACT
- CONTRACT 7610 Executed 11/13/08 US 395, NSC -US 2 LOWERING
- CONTRACT 7620 Executed 11/12/08 US 97, NORTH OF BLEWETT PASS SLOPE STABILIZATION
- CONTRACT 7614 WSF, EAGLE HARBOR MAINTENANCE BUILDING REMODEL AND DOCK REPAIRS
2007
- CONTRACT 7408-- WSF, KEYSTONE FERRY TERMINAL GENERATOR POWER INSTALLATION
- CONTRACT 7409-- Executed 10/18/07 US 97, ROADSIDE SAFETY IMPROVEMENTS
- CONTRACT 7412-- Executed 10/26/07 I-90, INDIAN JOHN HILL REST AREA WATER IMPROVEMENT
- CONTRACT 7410-- WSF, MUKILTEO FERRY TERMINAL INNER DOLPHIN REPLACEMENT
- CONTRACT 7411-- Executed 11/7/07 SR 515, SE 192ND ST TO BENSON RD, PAVING AND CHANNELIZATION
- CONTRACT 7414-- WSF, FAUNTLEROY FERRY TERMINAL TRESTLE INTERIM PRESERVATION
- CONTRACT 7420-- WSF, SYSTEMWIDE FERRY TERMINAL COUNTERWEIGHT CABLE REPLACEMENT
- CONTRACT 7419-- Executed 11/19/07 I-90, WEST OF GE0RGE PAVING
- CONTRACT 7422 SR3, PIONEER WAY AND BIG VALLEY RD-SIGNALS
- CONTRACT 7421-- Executed 11/27/07 SR 823, GOODLANDER TO HARRISON RD. BUILD SIDEWALK
- CONTRACT 7425-- Executed 11/27/07 I-5, BRIDGE 005/518 GIRDER REPLACEMENT
- CONTRACT 7419-- I-90, W OF GEORGE - PAVING
2006
- CONTRACT 7203 Executed 10/30/06--SR 16, 36TH ST TO OLYMPIC DR NW ROADSIDE RESTORATION
- CONTRACT 7200 Executed 11/6/06--I-405, SPRINGBROOK CREEK WETLAND AND HABITAT MITIGATION BANK
- CONTRACT 7204 Executed 11/6/06--SR 28, CRESCENT BAR TO QUINCY PAVING
- CONTRACT 7207 Executed 11/6/06--NC REGION SIGN UPDATE 2007
- CONTRACT 7205 Executed 10/26/2006--SR 20, WALKER HILL RD. TO GRAVES MTN. RD.-PAVING
- CONTRACT 7211 ANACORTES FERRY TERMINAL UPLAND PARKING LOT LANDSCAPE AND IRRIGATION
- CONTRACT 7212 Executed 11/14,2006--SR 14, TRAVELER INFORMATION ENHANCEMENT
2005
- CONTRACT 7041 Executed 10/26/05--SR 3, SR 161, OLYMPIC REGION CENTERLINE RUMBLE STRIPS
- CONTRACT 7031 Executed 10/20/05--SR 281, QUINCY SOUTH PAVING
- CONTRACT 7038 Executed 11/21/05--SR 202, JCT 292ND AVE SIGNAL & CHANNELIZATION
- CONTRACT 7032 Executed 12/15/2005--SR 3, SR 303 INTERCHANGE
- CONTRACT 7046 Executed 11/7/05--SR 207, WENATCHEE RIVER BR 207/4-RAIL RETROFIT
2004
- CONTRACT 6849- Executed 10/27/04--SR 527, 164TH ST SE TO 132ND ST SE ROADSIDE RESTORATION
- CONTRACT 6855- Executed 10/29/04--WSF, BREMERTON FERRY TERMINAL LIFT TOWER PILE REPAIR
- CONTRACT 6851- Executed 11/02/04--SR 31, METALINE FALLS TO THE INTERNATIONAL BORDER
2003
- CONTRACT 6655 - Executed 10/24/03-- 1/4 MILE EAST OF ANDERSON CREEK BR SLOPE STABILIZATION
- CONTRACT 6662 - All bids rejected--10/10/03--US 2/97, EASY ST. LINK STOP WB MP 115.14
- CONTRACT 6654 Executed 11/5/03-KING STREET STATION TOILET IMPROVEMENTS
- CONTRACT 6663 Executed 11/13/03 - I-5, CUSTER REST AREA SEWER REHABILITATION
- CONTRACT 6664 Executed 11/12/03 - US 2 & SR 26 DURABLE PAVEMENT MARKINGS - 2004
- CONTRACT 6667--Executed 11/24/03--WSF, ANACORTES FERRY TERMINAL MAINTENANCE
- CONTRACT 6658-- Executed 11/24/2003--I-90, TIBBETTS CREEK VICINITY CULVERT REPLACEMENT
- CONTRACT 6668 Executed 11/24/2003-- SR 28, QUINCY EAST - LEFT TURN LANES
2002
- CONTRACT 6436 Executed 11/5/2002- CITY OF MARYSVILLE ASH AVENUE PARK AND RIDE IMPROVEMENTS
- CONTRACT 6438 Executed 10/29/02 WSF, TAHLEQUAH FERRY TERMINAL DOLPHIN REPLACEMENT PHASE 1
- CONTRACT 6446 Executed 11/18/02 WSF, POINT DEFIANCE FERRY TERMINAL WINGWALL REPAIR
- CONTRACT 6445 Executed 11/7/02 NCR Sign Update 2003
- CONTRACT 6448 Executed 12/2/02 EAGLE HARBOR MAINTENANCE FACILITY DUCT COLLECTION SYSTEM REPLACEMENT
2001
- CONTRACT 6228 Executed 10/29/01--WISHKAH RIVER BRIDGE REHABILITATION
- CONTRACT 6229 All bids rejected 10/5/01--WHIDBEY ISLAND SECTION FACILITY
- CONTRACT 6230 Executed 10/29/01--BAINBRIDGE FERRY TERMINAL OVERHEAD LOADING RE-ROOF AND MISC. REPAIRS
- CONTRACT 6231 Executed 11/15/01--SR 5 HOLGATE TO 8TH AVE VICINITY SEISMIC RETROFIT
- CONTRACT 6237 Executed 11/9/01--SR 90 BARKER RD. I/C SIGNAL
- CONTRACT 6238 Executed 11/8/01--SR 90 RR O-XING TO ADAMS COUNTY LINE
- CONTRACT 6239 Executed 11/28/2001--SR 2 LINCOLN CO. LINE TO SR 21
- CONTRACT 6242 Executed 11/19/01--SR 513, MONTLAKE BRIDGE 513/12 BRIDGE PAINTING AND CRACK REPAIR
- CONTRACT 6243 Executed 11/14/01--SR 285 & 97 COLUMBIA RIVER BRIDGES SEISMIC RETROFIT
- CONTRACT 6244 Executed 11/19/2001--SR 125 & 11 STATELINE INTERSECTION
- CONTRACT 6245 Executed 11/26/2001--SR 5 & 518 MILITARY RD TO SR 900 SEISMIC RETROFIT
- CONTRACT 6248 Executed 10/31/2001--US 2 ICICLE SPILLWAY SLIDE REPAIR
- CONTRACT 6249 Executed 11/20/01--SR 5, BELLINGHAM AND BLAINE VIC BRIDGES SEISMIC RETROFIT
2000
- CONTRACT 5952 WHITE PASS SAND STORAGE BUILDING
- CONTRACT 5954 SR 99 SPOKANE ST OC SEISMIC STAGE TWO
- CONTRACT 5955 SR 303 RIDGETOP BLVD. NB OFF-RAMP SIGNALIZATION
- CONTRACT 5956 SR 97 OKANOGAN TO RIVERSIDE
- CONTRACT 5957 SR 24 HATTON ROAD CHANNELIZATION
- CONTRACT 5958 SR 504 CASTLE LAKE VIEWPOINT
- CONTRACT 5959 SPOKANE MODULAR PE BUILDING SITE IMPROVEMENTS
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.