Contract summary
Requires inlet protection, compost sock, high visibility fence, cement concrete traffic curb and gutter, pedestrian curb, plastic stop line, permanent signing, intelligent transportation systems (ITS) - rectagular rapid flashing beacon (RRFB) signals, project temporary traffic control, work zone safety contingency, shoring or extra excavation, Americans with disabilities act (ADA) features surveying, cement concrete sidewalk and curb ramp, force account irrigation repair, and other work. Involves 20 items and 20 working days. Work class 41.