Contract summary
Removing sidewalk, curb, gutter, pavement markings, and roadway excavation, installing crushed surfacing base course (CSBC), hot mix asphalt(HMA), curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ballast distribution, surface line and dress, surveying, erosion control, traffic control and other work, Contains 43 bid items and 25 working days. Class 54.