Temporary Erosion and Sediment Control Manual

Publication Number
M 3109
Publication Version
M 3109.02
Publication Date
Manual Manager
Jeannie McCully
Originator
Engineering and Regional Operations Development Division, Design Office

The Temporary Erosion and Sediment Control Manual (TESCM) replaces Chapter 6 and Appendix 6A of the Washington State Department of Transportation (WSDOT) Highway Runoff Manual. It outlines WSDOT’s policies for meeting the National Pollutant Discharge Elimination System (NPDES) Construction Stormwater General Permit requirements and the requirements in Volume II of the stormwater management manuals published by the Washington State Department of Ecology.

The TESCM is intended for use during the design, permitting, and construction phases of transportation construction projects. It covers:

  • TESC plan design and implementation
  • TESC BMP application and installation
  • SPCC plans
  • Discharge sampling and reporting
  • Site management and documentation
  • Compliance-related issues

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.