Prime Contractor Performance Report

Publication Number
M 41-40
Publication Version
M 41-40.06
Manual Manager
Jenna Fettig
Originator
Contract Ad and Award Office, Engineering and Regional Operations Division
Subject
Preparing and processing the Prime Contractor Performance Report

The Prime Contractor Performance Report was prepared to give project offices, regions, and other personnel of the Washington State Department of Transportation a working reference of uniform standards and procedures for the preparation and processing of the Prime Contractor Performance Report.

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.