• Study

SR 162 Orville Road Pre-design Study

Planning study news

Thank you for participating in the SR 162 Orville Road Pre-Design. The pre-design is complete and the project will begin design in April 2024.

In January and February of 2024, WSDOT conducted a community tabling event at the Orting Library, an advisory committee meeting, and an online open house featuring a roundabout concept at the intersection of SR 162 and Orville Road. The pre-design team received 101 comments during the public event. Community members expressed concerns about speeding and safety, and conveyed information about the growing traffic volumes and number of large vehicles towing trailers traveling through the intersection.

Timeline
October 2023 to March 2024
Status
Complete
Budget
The design and construction costs range from $3 million and $4 million for the single lane roundabout. Costs are planning level estimates.

Purpose

Information about the study, the recommended roundabout and feedback WSDOT received during the online open house is now available for viewing.

WSDOT routinely reviews rural intersections on the state highway system to find ways to reduce potential crashes to identify locations that are at the highest risk for severe crashes. The intersection of SR 162 and Orville Road located south of the City of Orting in Pierce County was identified as a location for safety improvement consideration. During the pre-design, WSDOT staff conducted traffic operations and crash analysis, engaged with local agencies, tribal partners, and the community to develop a recommended solution. 

SR 162 at Orville Road study area map.