US 2 – Colbert Rd Intersection Revision - Complete October 2023

Project overview

This project improves the safety at the US 2 and Colbert Road intersection in North Spokane County by installing J-Turns. WSDOT was able to secure funding to improve safety by adding J-Turns also known as RCUT's (Restricted Crossing U-Turn Intersection) to reduce the number of conflict points at the open median intersection and increase safety. The J-turns being installed will be similar to those that were constructed on US 195 at Thorpe Rd. in 2019.

Work was completed in October 2023.

Timeline
June 2023 - October 2023
Project status
Completed
Funding
$2.4 Million
Project hotline

What to expect

Now that the J-turns are constructed and complete, drivers will no longer be able to cross US 2 east or west on Colbert Road. Instead, drivers coming from either direction on Colbert Road will make a right turn onto US 2. Once the driver completes the right turn onto US 2, drivers may then merge safely into the left lane proceed into a dedicated turn lane to then make a U-turn once the roadway is clear, and travel the opposite direction on US 2. Drivers can then either continue on US 2 in the desired direction of travel or make a right turn onto Colbert Road to continue heading either east or west.

Those traveling either north or south on US 2 who want to make a left turn onto Colbert Road will still have the option via a dedicated left-hand turn lane at the existing median. 

Project map location for the US 2 at Colbert Road intersection improvement project.