Contract summary
The purpose of this project is to replace existing fish barrier crossings for Chico Creek and an Unnamed Tributary to Chico Creek with fish passable structures. The barriers are located at SR 3 MP 40.96, SR 3 southbound off-ramp to Chico Way, SR 3 southbound on-ramp, and an SR 3 maintenance access road. The project shall include, but is not limited to, the following:
Design and construction of fish passable water crossing structures, including all associated stream restoration. Providing design documentation in support of environmental review (SEPA/NEPA) process in which WSDOT is the lead acquiring environmental permits as an authorized agent of WSDOT. Acquiring all necessary property rights as an authorized agent of WSDOT.
Other elements including, but not limited to embankment, grading, paving, storm drainage, signing, illumination, erosion control, and planting.