Contract summary
Constructing modified concrete overlay, scarifying concrete surface, type 2 deck repair, planning bituminous surface, removing existing overlay from bridge deck, HMA paving, surveying for concrete overlay, steel reinforcement bar for deck repair, pavement markings, shoulder rumble strips, erosion control, traffic control and other work. Involves 45 items and 80 working days. Work class 6.