Contract summary
Requires demolition of the existing scale house and related existing infrastructure, including decommissioning existing septic system, construction and installation of a new scale house, inspection building and restroom unit with associated electrical, mechanical, water and sewage systems, as well as the scale pits, site grading, paving with hot mix asphalt and cement concrete pavement, installing sidewalks, curbs and gutters, concrete barrier, beam guardrail, illumination, drainage, and storm sewer systems, install weigh in motion system, delineation, traffic control and other work. Involves 87 bid items and 245 working days. Work class 7.