Legislative reports archive

See legislative reports for past bienniums.

Legislative reports for the 2021-2023 biennium

Orig Bill
No
Orig
Sect
Study Title/ TopicReport
Due Date
SSB 51651004 (3)
1005 (3)
Transfer: MVA State and Federal Appropriations (PDF 222KB)8/13/2021
SSB 5165306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Interim Report and Appendices (PDF 2.22MB)9/15/2021
SSB 5165215 (9)Public Health Association with Homeless Encampments on Department owned rights of way (PDF 994KB)10/1/2021
(semi-annually thereafter)
SHB 15144Commute Trip Reduction Program Report - September 2021 (PDF 696KB)10/1/2021
SSB 5165306 (13) (b)Statewide Culvert Remediation Plan Report (PDF 83.6KB) 11/1/2021
SSB 5165310 (2)Supplemental Freight Rail Investment Bank Project List (PDF 53.9KB)11/15/21
SSB 5165606Amounts expended for transit, bicycle, pedestrian elements (PDF 141KB)11/15/21
(Annually)
SSB 5165313Capital projects report - Quarter ending September 30, 2021 (PDF 1.54MB)11/15/21
Quarterly
SSB 5165601 (1) (l)Administrative Transfers11/15/21
Quarterly
SSB 5165601Transfers (PDF 35.9KB)11/22/21
SSB 5165213 (4)Broadband facilities consolidation report (PDF 105 KB)12/1/2021
SSB 5165306 (12) (c)I-5 Interstate Bridge Replacement project Progress Report (PDF 1.77MB)12/1/2021
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 809KB)

Apprenticeship Program Grant Awards (PDF 809KB)
12/1/2021
Annually
SSB 5165311 (3)Pedestrian Safety/Safe Routes to school grant program report (PDF 909KB)12/1/2021
RCW 47.66.100
RCW 47.66.030
RCW 47.66.030
RCW 47.66.120
SSB 5165
SSB 5165
RCW 47.66.080
RCW 47.06.110
RCW 70A.15.4060
RCW 70A.15.4100
RCW 47.01.330
3
3
1 (a)
4
220 (5)
220 (7) (b)

6
6
6
5
2021 Washington State Transportation Mobility Report (PDF 9.22MB)

Rural mobility grant program (PDF 9.22MB)
Regional mobility grant program (PDF 9.22MB)
Regional mobility grants prioritized project list (PDF 9.22MB)
Green Transportation Capital Grant Program project status update (PDF 9.22MB)
Region mobility grant Projects (PDF 9.22MB)
First Mile/Last Mile Connections (PDF 9.22MB)
Grant Programs Examination (PDF 9.22MB)
Report Summarizing the Public Transportation Plan progress (PDF 9.22MB)
Commute Trip Reduction Program (PDF 9.22MB)
State Agency Commute Trip Reduction Program (PDF 9.22MB)
Office of Transit Mobility (PDF 9.22MB)

 
12/1/2021
Annually


RCW 35.58.2796
RCW 47.66.110
 


2 (a)
6
 
2021 Transit Integration Report (PDF 3.15MB)

Annual report summarizing the status of the public transportation system coordination (PDF 3.15MB)
Report on the transit coordination grants that were awarded (PDF 3.15MB)
 
12/1/2021
Annually
RCW 35.58.279612020 Summary of Public Transportation (PDF 36.2MB)12/1/2021
Annually
SSB 5165209 (9)SR 520 Bridge Self-Insurance Evaluation (PDF 164KB)12/15/2021
SSB 5165216 (1)2019-2021 Low-cost enhancement projects (PDF 8.79MB)12/15/2021
(odd number years)
RCW 47.01.4801 (a)Practical Design-related Title & Scope Change Request - I-5 Rebuild Chamber Way Interchange Improvements (PDF 187KB)12/16/2021
SSB 5165218 (3)Vehicle Miles Traveled Targets - Initial Technical Report (PDF 136KB)12/31/21
RCW 47.64.3602FY 2021 WSF Performance Measures Report (PDF 844KB)12/31/2021 Annually
SSB 5165306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Final Report and Appendices (PDF 2.64MB)1/1/2022
SSB 5165221 (5)Staffing and Overtime for Engine & Deck Crewmembers1/1/2022
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 224KB)1/1/2022
RCW 47.60.830 FY21 Annual Diesel Fuel Price Hedging Report (PDF 388KB)1/1/2022
Annually
SSB 5165308 (2)Challenge Seattle project report (PDF 552KB)1/15/2022
SSB 5165219 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 1 & 2 (PDF 123KB)2/15/2022
Semi-Annually
SSB 5165313Capital projects quarterly report - Quarter ending December 30, 2021 (PDF 2.10MB)2/15/2022
Quarterly
SSB 5165601 (1) (l)Administrative Transfers2/15/2022
Quarterly
SSB 5165719Commercial Aviation Coordinating Commission Report - Six Locations (PDF 396KB)2/15/2022
RCW 47.01.4852Local Governments Determination on Permits. (PDF 125KB)3/1/2022
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations. (PDF 464KB)3/1/2022
Annually
SSB 5156310 (2)'21-23 Freight Rail Investment Bank (FRIB) Progress Report (PDF 82.8KB)3/15/2022
Annually
ESSB 5689219 (4)Interim Report - Modular Expansion Joint Noise Mitigation Study (PDF 555KB)3/31/2022
SSB 5165215 (9)Address risks to safety and public health regarding homeless encampments4/1/2022
ESSB 5689311Capital projects quarterly report - Quarter ending March 31, 2022 (PDF 2.10MB)5/15/22
Quarterly
SSB 5165601 (1) (l)Administrative Transfers5/15/22
Quarterly
ESSB 5689305 (12) (c)I-5 Interstate Bridge Replacement project (PDF 1.33MB)6/1/2022
ESSB 5689305 (13) (b)Fish Passage Barrier Removal project (PDF 22.8KB)6/1/2022
ESSB 5689219 (3)Vehicle Miles of Travel Targets - Interim Report (PDF 470KB)6/22/22
ESSB 5689223 (2)Amtrak Cascades Service Development Plan - Progress Report (PDF 110KB)6/30/2022
RCW 81.104.11592021 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.37MB)6/30/2022
Annually
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 232KB)7/1/2022
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 3 & 4 (PDF 126KB)8/15/22
Semi-Annually
ESSB 5689311Capital projects quarterly report - Quarter ending June 30, 2022 (PDF 2.10MB)8/15/22
Quarterly
ESSB 5689601 (1) (l)Administrative Transfers (PDF 347KB)8/15/22
Quarterly
RCW 47.01.4954Construction Program Business Plan (PDF 1.38MB)9/30/22
Biennially
SSB 5165103Report on evaluation of short term and long term facility and information technology needs (in light of increased levels of remote work). Study by OFM with collaboration with WSDOT and the Office of Chief Information Officer (OCIO).10/1/2022
RCW 47.04.285 2022 Biennial Transportation Attainment Report (PDF 426KB)10/1/2022
Biennially
ESSB 5689707State Commercial Aviation Coordinating Commission Report (PDF 140KB)10/15/2022
ESSB 5689216 (9)Public Health Associated with Homeless Encampments on Department Owned Rights of Way (PDF 452KB)11/1/2022
ESSB 5974412 (5) (b)Clean Fuels Program - State Transportation Investment Credit Revenue Generation Forecast (PDF 208KB)11/1/2022
Annually
ESSB 5689311Capital projects quarterly report - Quarter ending September 30, 2022 (PDF 1.14MB)11/15/22
Quarterly
SSB 5165601 (1) (l)Administrative Transfers11/15/22
Quarterly
ESSB 5689309  (2) & (6)FRAP/FRIB Prioritized List of Recommended Projects (PDF 113KB)11/15/2022
ESSB 5689602Amounts expended for transit, bicycle, pedestrian elements (PDF 198KB)11/15/22
(Annually)
ESSB 5689221 (16)Grants Management System (PDF 692KB)11/15/2022
ESSB 5689209 (2)


209 (5)
 
FY2022 Toll Division Annual Report (PDF 3.55MB)

I-405 Express Toll Lane Project Performance Measure Reports (PDF 3.55MB)

Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 3.55MB)
11/30/2022
SHB 13791 (3) &
2 (3)
Commercial Unpiloted Aircraft System Coordinator and Commercial Drone Registration Fee Review and Recommendations (PDF 409KB)12/1/2022
ESSB 5689216 (5)Safety Rest Area Free Coffee Program report (PDF 51.9KB)12/1/2022
SSB 5165209 (10)Provide updated recommendations for cost allocation12/1/2022
ESSB 5689305 (12) (c)I-5 Interstate Bridge Replacement Program Progress Report (PDF 1.46MB)12/1/2022
ESSB 5689310 (3)Pedestrian/Bike and Safe Routes to School Programs Project Lists and Update (PDF 2.15MB)12/1/2022
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 574KB)

Apprenticeship Program Grants Awards (PDF 574KB)
12/1/2022
Annually
SSB 5975209 (5)Executive Summary: Recommended Approach and Funding Request for I-5 causeway (PDF 997KB)12/1/2022
SSB 5975209 (5)I-5 Study Seismic Report and Funding Request Report (PDF 1.37MB)

Appendix A - Structure Location Maps (PDF 929KB)
Appendix B - Geotechnical Hazard Maps (PDF 950KB)
Appendix C, Part 1 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.6MB)
Appendix C, Part 2 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.8MB)
Appendix D - Retaining Walls and Embankments Analysis (PDF 369KB)
Appendix E - Seismic Vulnerability Analysis Study Example (PDF 1.42MB)
12/31/2022
ESSB 5689218 (3)Community Workforce Agreement and Diversity, Equity, & Inclusion Report (PDF 254KB)12/1/2022
SSB 5975211 (6)Tiered NL3 LEAP List - Prioritize Projects Based on Community Impacts (PDF 427KB)12/1/2022
ESSB 5689222 (18)WSF Training & Workforce Development Status Report (PDF 298KB)12/1/2022
ESSB 5974420Elimination of Fares for Amtrak Cascades Passengers 18 Years old and Under (PDF 113KB)12/1/2022
ESSB 5974417 (5)Connecting Communities Pilot Program Report (PDF 885KB)12/1/2022
ESSB 5974419 (5)School-Based Bicycle Safety Education Program Report (PDF 150KB)12/1/2022
SSB 5975204Sustainable Aviation Grant Program Report (PDF 203KB)12/1/2022
SSB 5975308 (2)Active Transportation Projects - Ranked NL-2 LEAP List (PDF 380KB)12/1/2022


RCW 47.66.030
RCW 47.66.100
RCW 47.66.120
ESSB 5689
ESSB 5689
RCW 47.01.330
RCW 47.06.110

3
4
221 (5)
221 (7) (b)
Washington State Public Transportation Mobility Report (PDF 9.49MB)

Regional mobility grants (PDF 9.49MB)
Rural Mobility Grants (PDF 9.49MB)
Green Transportation Capital Grant Project Project Status Update (PDF 9.49MB)
Regional Mobility Grant Projects (PDF 9.49MB)
First Mile/Last Mile Connection Grant Program's Effectiveness (PDF 9.49MB)
Office of Transmit Mobility Report (PDF 9.49MB)
Report Summarizing the Public Transportation Plan Progress (PDF 9.49MB)
12/1/2022
Annually
RCW 47.66.0301 (a)Regional mobility grants prioritized list (PDF 719KB)12/1/2022
Annually


RCW 35.58.2796

RCW 47.66.110


2 (a)

6
2022 Transit Integration Report (PDF 1.60MB)

Annual report summarizing the status of the public transportation system coordination (PDF 1.60MB)

Report on the transit coordination grants that were awarded(PDF 1.60MB)
12/1/2022
Annually
RCW 35.58.279612021 Summary of Public Transportation (PDF 34.9MB)12/1/2022
Annually
RCW 47.66.1201 (a)Green Transportation Capital Grant Program prioritized project list. (PDF 528KB)12/1/22
(even-numbered years)
ESSB 5689221 (15) Frequent Transit Service Study Initial Report (PDF 1.87MB)12/15/2022
RCW 47.64.3602FY2022 WSF Performance Measures Report (PDF 940KB)12/31/2022 Annually
ESSB 5689219 (4)Final Report of Reducing Noise Impacts from the SR 520 Expansion Joints (PDF 2.32MB)12/31/2022
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 293KB)1/1/2023
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report - FY22 (PDF 367KB)1/1/2023
Annually
ESSB 5689210 (2)
211
214 (7)
216 (11)
217 (3)
218 (2)
219 (8)
Contingency Funding to Address Staff Vacancies (PDF 320KB)1/1/2023
ESSB 5689222 (21)Study on cost-effective strategies to maximize walk-on passenger of the Anacortes/San Juan ferry routes1/6/2023
ESSB 5689216 (15) (d)Safety Rest Area Report - Additional Operations and Maintenance Activities (PDF 625KB)1/15/2023
ESSB 5689216 (16) (f)Safety Rest Area Anti-Human Trafficking Informational Poster Report (PDF 113KB)1/15/2023
SHB 16552 (3)Implemented or Planned Changes to Safety Rest Area Operations (PDF 109KB)1/15/2023
ESSB 5689218 (4)Small Business Enterprise Set-Aside Report (PDF 125KB)1/31/2023
ESSB 5689308 (2)Semi-annual WSF Project Status Update2/2/2023
Semi-Annually
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY23 Quarters 1 & 2 (PDF 257KB)2/15/23
Semi-Annually
ESSB 5689311Capital projects quarterly report - Quarter ending December 31, 2022 (PDF 1.03MB)2/15/23
Quarterly
ESSB 5689601 (1) (k)Administrative Transfers (PDF 253KB)2/15/23
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days. (PDF 122KB)3/1/2023
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 275KB)3/1/2023
Annually
ESSB 5689309 (2)Freight Rail Investment Bank (FRIB) Progress Report (PDF 83.3KB)3/17/23
ESSB 5689216 (9)Public Health Associated with Homeless Encampments on Department Owned Rights of Way, May 2023 (PDF 955KB)5/1/2023
ESSB 5689311Capital projects quarterly report5/15/2023
Quarterly
SSB 5165601 (1) (l)Administrative Transfers5/15/2023
Quarterly
ESSB 5689209 (3) (b)New Tolling Back Office System Report (PDF 519KB)5/16/2023
ESSB 5689707State Commercial Aviation Coordinating Commission Final Report (PDF 616KB)6/15/2023
SSB 5092129 (99)Creates a new Aviation and Aerospace Advisory Committee supported by Dept. of Commerce. Includes WSDOT Secretary or designee as Aviation Director as admin. co-chair. A strategic plan must be developed for the Dept of Commerce's aerospace, aviation, and airport economic development program, with guidance from the Advisory committee.6/30/2023
ESSB 5689219 (3)Vehicle Miles Traveled Targets - Final Report (PDF 1.29MB)6/30/2023
SSB 5975209 (3)I-5 Master Plan - Interim Report (PDF 2.73MB)6/30/2023
SSB 5975209 (4)I-5 Near-Term and Longer-Term HOV Recommendations - Interim Report (PDF 2.35MB)6/30/2023
ESSB 5689219 (9)Performance Based Project Evaluation Model Report (PDF 1MB)6/30/2023
ESSB 5689221 (15) (a)Frequent Transit Service Study Final Report (PDF 628KB)6/30/2023
ESSB 5689222 (19)Mukilteo Multimodal Terminal Solar Power Generation Report6/30/2023
ESSB 5689223 (3)Ultra High-Speed Ground Transportation Report (PDF 775KB)6/30/2023
SSB 5092129 (99)Aviation and Aerospace Advisory Committee Strategic Plan6/30/2023
SSB 5975303 (5)US 2 Westbound Trestle Status Report (PDF 3.58MB)6/30/2023
RCW 81.104.11592022 Rail Fixed Guideway Public Transportation System Safety Report (PDF 6.81MB)6/30/2023
(Annually)
ESSB 5689219 (6)SR302 Victor Area Corridor Study (PDF 27.1MB)6/30/2023
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES8/15/2023
Semi-Annually
ESSB 5689311Capital projects quarterly report8/15/23
Quarterly
SSB 5165601 (1) (l)Administrative Transfers8/15/23
Quarterly
SSB 5165209 (2)

209 (5)

 
I-405 Express Toll Lane Project Performance Measure Reports

The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility
11/30/2023

Legislative reports for the 2019-2021 biennium

Orig Bill
No
Orig
Sect
Study Title/ TopicReport
Due Date
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 240KB)7/1/2019
RCW 81.104.1159Rail Fixed Guideway Public Transportation System Safety Report (PDF 889KB)8/21/2019
ESHB 1160601Transfers (PDF 98.1KB)9/19/2019
ESHB 1160306 (22)Connecting WA Project Advancement (PDF 176KB)9/24/2019
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 108KB)11/15/19
Quarterly
ESHB 1160313Capital projects quarterly report (PDF 894KB)11/15/19
Quarterly
ESHB 1160606Amounts expended for transit, bicycle, pedestrian elements (PDF 149KB)11/15/19
Annually
ESHB 1160601(1)(h)Administrative Transfers (PDF 64KB)11/15/19
Quarterly
ESHB 1160601Transfers (PDF 99KB)11/18/19
ESHB 1160218(2)SR 518 - SR 509 to I-5 Corridor Planning Study11/30/2019
RCW 47.01.435 ESHB 11606 217 (1)Highway Construction Workforce Development Report Apprenticeship Program Grant Awards (PDF 809KB)12/1/2019
Annually
RCW 47.66.030
RCW 47.01.330
RCW 47.66.100
ESHB 1160
RCW 47.06.110
RCW 47.66.030
RCW 70.94.537
ESHB 1160
RCW 70.94.551
3

3
220(5)

1 (a)
6
220(7)(a)
6
Public Transportation Mobility Report (PDF 5.05MB)
Regional mobility grants (PDF 5.05MB)
Office of Transit Mobility Report Rural mobility grants (PDF 5.05MB)
Regional Mobility Grant Projects (PDF 5.05MB)
Report summarizing the Public Transportation Plan progress (PDF 5.05MB)
Regional mobility grants prioritized list (PDF 5.05MB)
CTR Board Report (PDF 5.05MB)
Pilot transit pass incentive program update (PDF 5.05MB)
State Agency CTR Report (PDF 5.05MB)
12/1/2019
Annually
RCW 35.58.2796 RCW 47.66.1102 (a) 6Transit Integration Report Report on the transit coordination grants that were awarded. (PDF 2.80MB)12/1/2019
Annually
ESHB 1160214(2)Kingsgate Transit Oriented Development Report (PDF 524KB)

May 2021 Report Addendum (PDF 44KB)
12/1/2019

5/20/2021
ESHB 1160306(24)
(e)(iii)
Progress report on activities related to the replacement of the I-5 Columbia River Bridge.12/1/2019
ESHB 1160311(3)Project status report for Pedestrian Safety/Safe Routes to school grant program. (PDF 833KB)12/1/2019
RCW 35.58.279612018 Washington State Summary of Public Transportation12/1/2019
Annually
E2SHB 204218 (1) (a)Green Transportation Capital Grant Program prioritized project list. (PDF 91KB)12/1/2019
Annually in even-numbered years
ESHB 1160216(1)Report on all low-cost enhancements completed in the prior biennium. (PDF 825KB)12/15/2019 and every odd number year
ESHB 1160209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports (pdf 507 kb) Washington state patrol enforcement hours of toll violations (PDF 421KB)12/15/19
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 1.15MB)
12/15/19
Quarterly
ESHB 1160210(1)Labor Systems Replacement report on timeline. (PDF 593KB)12/31/2019
RCW 47.64.3602FY 2019 WSF Performance Measures Report (PDF 589KB)12/31/2019 Annually
ESHB 1160221(7)WSF Overtime Analysis Report (PDF 2.44MB)1/1/2020
ESHB 1160310(11)Freight Rail Investment Bank (FRIB) and Freight Rail Assistance Projects (FRAP) funded projects update (PDF 95KB)1/1/2020
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 224KB)1/1/2020
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report (PDF 729KB)1/1/2020
Annually
RCW 70.95.807 Recycled Concrete Usage in Aggregate Materials (PDF 206KB)1/2/2020
Annually
ESHB 1160601Transfers (PDF 54.3KB)2/12/2020
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 109KB)2/15/2020
Quarterly
ESHB 1160313Capital projects quarterly report (PDF 780KB)2/15/2020
Quarterly
ESHB 1160601(1)(h)Administrative Adjustments (PDF 49.2KB)2/15/2020
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days (PDF 441KB)3/1/2020
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 486KB)3/1/2020
Annually
ESHB 1160209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports (pdf 507 kb) Washington state patrol enforcement hours of toll violations (PDF 448KB)3/15/2020
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 448KB)
3/15/2020
Quarterly
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 112KB)5/15/20
Quarterly
ESHB 2322601Transfers (PDF 50.1KB)5/13/20
ESHB 2322311Capital projects quarterly report (PDF 895KB)5/15/20
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 74.9KB)5/15/20
Quarterly
ESHB 1160209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports (PDF 507KB) Washington state patrol enforcement hours of toll violations (PDF 454KB)6/15/20
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 473KB)
6/15/20
Quarterly
RCW 81.104.1159Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.30MB)6/30/2020
Annually
ESHB 1160309(6)WSF Electrification Plan - Report (PDF 4.2MB)
WSF Electrification Plan - Appendices (PDF 5.79MB)
6/30/2020
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 229MB)7/1/2020
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 121KB)8/15/20
Quarterly
ESHB 2322311Capital projects quarterly report (PDF 1.01MB)8/15/20
Quarterly
ESHB 2322601Transfers (PDF 49.7KB)8/15/20
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 59.5KB)8/15/20
Quarterly
ESHB 2322209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations (PDF 516KB)9/15/20
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 489KB)
9/15/20
Quarterly
RCW 47.01.4954Construction Program Business Plan (PDF 1.8MB)9/30/20
Biennially
RCW 47.04.285 Attainment Report (PDF 1.79MB)10/1/2020
ESHB 1160213(4)(b)Surplus Property report (PDF 246KB)10/1/2020
ESHB 2322305(25)(b)Statewide Culvert Remediation Plan Update (PDF 1.22MB)11/1/2020
ESHB 2322212(3)(c)Electric Aircraft Feasibility Study (PDF 6.55MB)11/15/2020
ESHB 2322309 (2) 309 (6)Freight Rail Investment Bank (FRIB) and Freight Rail Assistance Program (FRAP) Project Lists (PDF 157KB)11/15/2020
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 113KB)11/15/20
Quarterly
ESHB 2322311Capital projects quarterly report (PDF 302KB)11/15/20
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 48.4KB)11/15/20
Quarterly
ESHB 2322601Transfers (PDF 77.7KB)11/15/20
Quarterly
ESHB 2322602Amounts expended for transit, bicycle, pedestrian elements (PDF 133KB)11/15/20
Annually
ESHB 2322310(8)(b)Stakeholder Recommendations for a Washington State Freight Advisory Committee (PDF 484KB)12/1/2020
ESHB 2322220(17) 305(36) 308(12) 309(18) 310(27)Allotment Modification report (PDF 33.2KB)12/1/2020
ESHB 2322209(9)Report on Cost Allocation and Changes or Potential Impacts to Toll Rates (PDF 347KB)12/1/2020
ESSB 6168137Surety Bonding Accessibility Study (PDF 785KB)12/1/2020
ESHB 1160311(3)Project status report for Pedestrian Safety/Safe Routes to school grant program (PDF 843 KB)12/1/2020
ESHB 2322222(1)Cascadia Ultra High-Speed Rail Study (PDF 8.47MB)12/1/2020
ESHB 1160306(24)
(e)(iii)
Interstate Bridge Replacement Program Progress Report (PDF 3.6MB)12/1/2020
ESHB 1160306(24)
(e)(ii)
Interstate Bridge Replacement Program Conceptual Financial Plan (PDF 2.7MB)12/1/2020
ESHB 1160215(8)Safety Rest Area Free Coffee Program Report (PDF 141KB)12/1/2020
RCW 47.01.435 ESHB 11606 217 (1)Highway Construction Workforce Development Report Apprenticeship Program Grant Awards (PDF 431KB)12/1/2020
Annually
RCW 47.66.100
RCW 47.66.030
RCW 47.66.120
RCW 47.06.110
RCW 47.01.330
RCW 47.06.110
RCW 47.66.120
ESHB 2322
3
3
4
6
5

4
220 (7) & (18)
2020 Public Transportation Mobility Report (PDF 8.39MB)
Rural Mobility Grant Program Regional mobility grants (PDF 8.39MB)
Green Transportation Capital Grant Program (PDF 8.39MB)
Public Transportation Plan Office of Transit Mobility (PDF 8.39MB)
Report summarizing the Public Transportation Plan progress (PDF 8.39MB)
Green Transportation Capital Grant Program project status update (PDF 8.39MB)
12/1/2020
Annually
RCW 35.58.2796 RCW 47.66.1102 (a) 6Transit Integration Report Report on the transit coordination grants that were awarded (PDF 1.43MB)12/1/2020
Annually
RCW 35.58.279612019 Summary of Public Transportation (PDF 35.5MB)12/1/2020
Annually
RCW 47.66.1201 (a)Green Transportation Capital Grant Program prioritized project list (PDF 145KB)12/1/20
Annually in even-numbered years
RCW 47.66.0301 (a)2021-2023 Regional Mobility Grant Program Prioritized List (PDF 239KB)12/1/2020
Annually
ESHB 2322209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports (PDF 507KB) Washington state patrol enforcement hours of toll violations (PDF 507KB)12/15/20
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 449KB)
12/15/20
Quarterly
ESHB 1160709 (3)SR 167 HOT lane pilot (PDF 3.81MB)
(within annual report)
12/31/20
(Annually)
ESHB 2322218(7)Performance-Based Project Evaluation Feasibility Report (PDF 925KB)12/31/2020
RCW 47.64.3602WSF FY2020 Performance Measures Report (PDF 644KB)12/31/2020 Annually
RCW 47.01.4357Pre-Apprentice Support Services (PASS) Program Summary Report 2015-2020 (PDF 964KB)12/31/2020
SSB 5370 Commercial Aviation Coordinating Commission Report (PDF 204KB)1/1/2021
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 224KB)1/1/2021
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report (PDF 609KB)1/1/2021
Annually
RCW 70A.205.705 Recycled Concrete Usage in Aggregate Materials (PDF 744KB)1/2/2021
Annually
ESHB 1160221(9)Triangle Route Service Plan1/15/2021
ESHB 1160217(3)Studded Tire Damage Campaign Report (PDF 415KB)1/14/2021
ESHB 1160215(1)(b)Report on the amount of funds requested, the funds granted, and the strategies used to keep utility fee costs down.1/17/2021
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 110KB)2/15/21
Quarterly
ESHB 2322311Capital projects quarterly report2/15/21
Quarterly
ESHB 2322601Transfers (PDF 48.4KB)2/15/21
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 21.1KB)2/15/21
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days (PDF 128KB)3/1/2021
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 214KB)3/1/2021
Annually
RCW 47.66.080 Grant Program Examination3/15/2021
ESHB 2322209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports (pdf 526 kb) Washington state patrol enforcement hours of toll violations (PDF 526KB)3/15/21
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 517KB)
3/15/21
Quarterly
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 120KB)5/15/21
Quarterly
ESHB 2322311Capital projects quarterly report (PDF 1.31MB)5/15/21
Quarterly
ESHB 2322601Transfers (PDF 49.5KB)5/15/21
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 46.3KB)5/15/21
Quarterly
ESHB 2322209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations
(PDF 569KB)
6/15/21
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 498KB)
6/15/21
Quarterly
RCW 81.104.1159Rail Fixed Guideway Public Transportation System Safety Report (PDF 1MB)6/30/2021
(Annually)
ESHB 2322214(6)Pierce County TOD Opportunities Report (PDF 163KB)6/30/2021
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 229KB)7/1/2021
ESHB 1160219(2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 240KB)8/15/21
Quarterly
ESHB 2322311Capital projects quarterly report8/15/21
Quarterly
ESHB 2322601(1)(h)Administrative Adjustments (PDF 79.4KB)8/15/21
Quarterly
ESHB 2322601Transfers (PDF 376KB)9/9/21
ESHB 2322209(2) 209(8)I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations
(PDF 550KB)
9/15/21
Quarterly
ESHB 1160209(4)The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 512KB)
9/15/21
Quarterly

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.