SSB 5165 | 1004 (3) 1005 (3) | Transfer: MVA State and Federal Appropriations (PDF 222KB) | 8/13/2021 |
SSB 5165 | 306 (9) (b) 209 (8) | I-405/SR 167 Financial Plan Interim Report and Appendices (PDF 2.22MB) | 9/15/2021 |
SSB 5165 | 215 (9) | Public Health Association with Homeless Encampments on Department owned rights of way (PDF 994KB) | 10/1/2021 (semi-annually thereafter) |
SHB 1514 | 4 | Commute Trip Reduction Program Report - September 2021 (PDF 696KB) | 10/1/2021 |
SSB 5165 | 306 (13) (b) | Statewide Culvert Remediation Plan Report (PDF 83.6KB) | 11/1/2021 |
SSB 5165 | 310 (2) | Supplemental Freight Rail Investment Bank Project List (PDF 53.9KB) | 11/15/21 |
SSB 5165 | 606 | Amounts expended for transit, bicycle, pedestrian elements (PDF 141KB) | 11/15/21 (Annually) |
SSB 5165 | 313 | Capital projects report - Quarter ending September 30, 2021 (PDF 1.54MB) | 11/15/21 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 11/15/21 Quarterly |
SSB 5165 | 601 | Transfers (PDF 35.9KB) | 11/22/21 |
SSB 5165 | 213 (4) | Broadband facilities consolidation report (PDF 105 KB) | 12/1/2021 |
SSB 5165 | 306 (12) (c) | I-5 Interstate Bridge Replacement project Progress Report (PDF 1.77MB) | 12/1/2021 |
RCW 47.01.435
SSB 5165 | 6
917 (1) | Highway Construction Workforce Development Report (PDF 809KB)
Apprenticeship Program Grant Awards (PDF 809KB) | 12/1/2021 Annually |
SSB 5165 | 311 (3) | Pedestrian Safety/Safe Routes to school grant program report (PDF 909KB) | 12/1/2021 |
RCW 47.66.100 RCW 47.66.030 RCW 47.66.030 RCW 47.66.120 SSB 5165 SSB 5165 RCW 47.66.080 RCW 47.06.110 RCW 70A.15.4060 RCW 70A.15.4100 RCW 47.01.330 | 3 3 1 (a) 4 220 (5) 220 (7) (b)
6 6 6 5 | 2021 Washington State Transportation Mobility Report (PDF 9.22MB)
Rural mobility grant program (PDF 9.22MB) Regional mobility grant program (PDF 9.22MB) Regional mobility grants prioritized project list (PDF 9.22MB) Green Transportation Capital Grant Program project status update (PDF 9.22MB) Region mobility grant Projects (PDF 9.22MB) First Mile/Last Mile Connections (PDF 9.22MB) Grant Programs Examination (PDF 9.22MB) Report Summarizing the Public Transportation Plan progress (PDF 9.22MB) Commute Trip Reduction Program (PDF 9.22MB) State Agency Commute Trip Reduction Program (PDF 9.22MB) Office of Transit Mobility (PDF 9.22MB)
| 12/1/2021 Annually |
RCW 35.58.2796 RCW 47.66.110 |
2 (a) 6 | 2021 Transit Integration Report (PDF 3.15MB)
Annual report summarizing the status of the public transportation system coordination (PDF 3.15MB) Report on the transit coordination grants that were awarded (PDF 3.15MB) | 12/1/2021 Annually |
RCW 35.58.2796 | 1 | 2020 Summary of Public Transportation (PDF 36.2MB) | 12/1/2021 Annually |
SSB 5165 | 209 (9) | SR 520 Bridge Self-Insurance Evaluation (PDF 164KB) | 12/15/2021 |
SSB 5165 | 216 (1) | 2019-2021 Low-cost enhancement projects (PDF 8.79MB) | 12/15/2021 (odd number years) |
RCW 47.01.480 | 1 (a) | Practical Design-related Title & Scope Change Request - I-5 Rebuild Chamber Way Interchange Improvements (PDF 187KB) | 12/16/2021 |
SSB 5165 | 218 (3) | Vehicle Miles Traveled Targets - Initial Technical Report (PDF 136KB) | 12/31/21 |
RCW 47.64.360 | 2 | FY 2021 WSF Performance Measures Report (PDF 844KB) | 12/31/2021 Annually |
SSB 5165 | 306 (9) (b) 209 (8) | I-405/SR 167 Financial Plan Final Report and Appendices (PDF 2.64MB) | 1/1/2022 |
SSB 5165 | 221 (5) | Staffing and Overtime for Engine & Deck Crewmembers | 1/1/2022 |
RCW 47.01.480 | 2 (b) | Practical Designs Savings Report (PDF 224KB) | 1/1/2022 |
RCW 47.60.830 | | FY21 Annual Diesel Fuel Price Hedging Report (PDF 388KB) | 1/1/2022 Annually |
SSB 5165 | 308 (2) | Challenge Seattle project report (PDF 552KB) | 1/15/2022 |
SSB 5165 | 219 (2) & (3) | Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 1 & 2 (PDF 123KB) | 2/15/2022 Semi-Annually |
SSB 5165 | 313 | Capital projects quarterly report - Quarter ending December 30, 2021 (PDF 2.10MB) | 2/15/2022 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 2/15/2022 Quarterly |
SSB 5165 | 719 | Commercial Aviation Coordinating Commission Report - Six Locations (PDF 396KB) | 2/15/2022 |
RCW 47.01.485 | 2 | Local Governments Determination on Permits. (PDF 125KB) | 3/1/2022 Annually |
RCW 47.85.040 | 5 | Report summarizing violations of environmental permits and regulations. (PDF 464KB) | 3/1/2022 Annually |
SSB 5156 | 310 (2) | '21-23 Freight Rail Investment Bank (FRIB) Progress Report (PDF 82.8KB) | 3/15/2022 Annually |
ESSB 5689 | 219 (4) | Interim Report - Modular Expansion Joint Noise Mitigation Study (PDF 555KB) | 3/31/2022 |
SSB 5165 | 215 (9) | Address risks to safety and public health regarding homeless encampments | 4/1/2022 |
ESSB 5689 | 311 | Capital projects quarterly report - Quarter ending March 31, 2022 (PDF 2.10MB) | 5/15/22 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 5/15/22 Quarterly |
ESSB 5689 | 305 (12) (c) | I-5 Interstate Bridge Replacement project (PDF 1.33MB) | 6/1/2022 |
ESSB 5689 | 305 (13) (b) | Fish Passage Barrier Removal project (PDF 22.8KB) | 6/1/2022 |
ESSB 5689 | 219 (3) | Vehicle Miles of Travel Targets - Interim Report (PDF 470KB) | 6/22/22 |
ESSB 5689 | 223 (2) | Amtrak Cascades Service Development Plan - Progress Report (PDF 110KB) | 6/30/2022 |
RCW 81.104.115 | 9 | 2021 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.37MB) | 6/30/2022 Annually |
RCW 47.01.480 | 2 (b) | Practical Designs Savings Report (PDF 232KB) | 7/1/2022 |
ESSB 5689 | 220 (2) & (3) | Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 3 & 4 (PDF 126KB) | 8/15/22 Semi-Annually |
ESSB 5689 | 311 | Capital projects quarterly report - Quarter ending June 30, 2022 (PDF 2.10MB) | 8/15/22 Quarterly |
ESSB 5689 | 601 (1) (l) | Administrative Transfers (PDF 347KB) | 8/15/22 Quarterly |
RCW 47.01.495 | 4 | Construction Program Business Plan (PDF 1.38MB) | 9/30/22 Biennially |
SSB 5165 | 103 | Report on evaluation of short term and long term facility and information technology needs (in light of increased levels of remote work). Study by OFM with collaboration with WSDOT and the Office of Chief Information Officer (OCIO). | 10/1/2022 |
RCW 47.04.285 | | 2022 Biennial Transportation Attainment Report (PDF 426KB) | 10/1/2022 Biennially |
ESSB 5689 | 707 | State Commercial Aviation Coordinating Commission Report (PDF 140KB) | 10/15/2022 |
ESSB 5689 | 216 (9) | Public Health Associated with Homeless Encampments on Department Owned Rights of Way (PDF 452KB) | 11/1/2022 |
ESSB 5974 | 412 (5) (b) | Clean Fuels Program - State Transportation Investment Credit Revenue Generation Forecast (PDF 208KB) | 11/1/2022 Annually |
ESSB 5689 | 311 | Capital projects quarterly report - Quarter ending September 30, 2022 (PDF 1.14MB) | 11/15/22 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 11/15/22 Quarterly |
ESSB 5689 | 309 (2) & (6) | FRAP/FRIB Prioritized List of Recommended Projects (PDF 113KB) | 11/15/2022 |
ESSB 5689 | 602 | Amounts expended for transit, bicycle, pedestrian elements (PDF 198KB) | 11/15/22 (Annually) |
ESSB 5689 | 221 (16) | Grants Management System (PDF 692KB) | 11/15/2022 |
ESSB 5689 | 209 (2)
209 (5) | FY2022 Toll Division Annual Report (PDF 3.55MB)
I-405 Express Toll Lane Project Performance Measure Reports (PDF 3.55MB)
Use of Consultants Non-Vendor Costs Vendor-Related Costs Toll Adjudication Process Summary of Toll Revenue by facility (PDF 3.55MB) | 11/30/2022 |
SHB 1379 | 1 (3) & 2 (3) | Commercial Unpiloted Aircraft System Coordinator and Commercial Drone Registration Fee Review and Recommendations (PDF 409KB) | 12/1/2022 |
ESSB 5689 | 216 (5) | Safety Rest Area Free Coffee Program report (PDF 51.9KB) | 12/1/2022 |
SSB 5165 | 209 (10) | Provide updated recommendations for cost allocation | 12/1/2022 |
ESSB 5689 | 305 (12) (c) | I-5 Interstate Bridge Replacement Program Progress Report (PDF 1.46MB) | 12/1/2022 |
ESSB 5689 | 310 (3) | Pedestrian/Bike and Safe Routes to School Programs Project Lists and Update (PDF 2.15MB) | 12/1/2022 |
RCW 47.01.435
SSB 5165 | 6
917 (1) | Highway Construction Workforce Development Report (PDF 574KB)
Apprenticeship Program Grants Awards (PDF 574KB) | 12/1/2022 Annually |
SSB 5975 | 209 (5) | Executive Summary: Recommended Approach and Funding Request for I-5 causeway (PDF 997KB) | 12/1/2022 |
SSB 5975 | 209 (5) | I-5 Study Seismic Report and Funding Request Report (PDF 1.37MB)
Appendix A - Structure Location Maps (PDF 929KB) Appendix B - Geotechnical Hazard Maps (PDF 950KB) Appendix C, Part 1 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.6MB) Appendix C, Part 2 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.8MB) Appendix D - Retaining Walls and Embankments Analysis (PDF 369KB) Appendix E - Seismic Vulnerability Analysis Study Example (PDF 1.42MB) | 12/31/2022 |
ESSB 5689 | 218 (3) | Community Workforce Agreement and Diversity, Equity, & Inclusion Report (PDF 254KB) | 12/1/2022 |
SSB 5975 | 211 (6) | Tiered NL3 LEAP List - Prioritize Projects Based on Community Impacts (PDF 427KB) | 12/1/2022 |
ESSB 5689 | 222 (18) | WSF Training & Workforce Development Status Report (PDF 298KB) | 12/1/2022 |
ESSB 5974 | 420 | Elimination of Fares for Amtrak Cascades Passengers 18 Years old and Under (PDF 113KB) | 12/1/2022 |
ESSB 5974 | 417 (5) | Connecting Communities Pilot Program Report (PDF 885KB) | 12/1/2022 |
ESSB 5974 | 419 (5) | School-Based Bicycle Safety Education Program Report (PDF 150KB) | 12/1/2022 |
SSB 5975 | 204 | Sustainable Aviation Grant Program Report (PDF 203KB) | 12/1/2022 |
SSB 5975 | 308 (2) | Active Transportation Projects - Ranked NL-2 LEAP List (PDF 380KB) | 12/1/2022 |
RCW 47.66.030 RCW 47.66.100 RCW 47.66.120 ESSB 5689 ESSB 5689 RCW 47.01.330 RCW 47.06.110 | 3 3 4 221 (5) 221 (7) (b) | Washington State Public Transportation Mobility Report (PDF 9.49MB)
Regional mobility grants (PDF 9.49MB) Rural Mobility Grants (PDF 9.49MB) Green Transportation Capital Grant Project Project Status Update (PDF 9.49MB) Regional Mobility Grant Projects (PDF 9.49MB) First Mile/Last Mile Connection Grant Program's Effectiveness (PDF 9.49MB) Office of Transmit Mobility Report (PDF 9.49MB) Report Summarizing the Public Transportation Plan Progress (PDF 9.49MB) | 12/1/2022 Annually |
RCW 47.66.030 | 1 (a) | Regional mobility grants prioritized list (PDF 719KB) | 12/1/2022 Annually |
RCW 35.58.2796
RCW 47.66.110 |
2 (a)
6 | 2022 Transit Integration Report (PDF 1.60MB)
Annual report summarizing the status of the public transportation system coordination (PDF 1.60MB)
Report on the transit coordination grants that were awarded(PDF 1.60MB) | 12/1/2022 Annually |
RCW 35.58.2796 | 1 | 2021 Summary of Public Transportation (PDF 34.9MB) | 12/1/2022 Annually |
RCW 47.66.120 | 1 (a) | Green Transportation Capital Grant Program prioritized project list. (PDF 528KB) | 12/1/22 (even-numbered years) |
ESSB 5689 | 221 (15) | Frequent Transit Service Study Initial Report (PDF 1.87MB) | 12/15/2022 |
RCW 47.64.360 | 2 | FY2022 WSF Performance Measures Report (PDF 940KB) | 12/31/2022 Annually |
ESSB 5689 | 219 (4) | Final Report of Reducing Noise Impacts from the SR 520 Expansion Joints (PDF 2.32MB) | 12/31/2022 |
RCW 47.01.480 | 2 (b) | Practical Designs Savings Report (PDF 293KB) | 1/1/2023 |
RCW 47.60.830 | | Annual Diesel Fuel Price Hedging Report - FY22 (PDF 367KB) | 1/1/2023 Annually |
ESSB 5689 | 210 (2) 211 214 (7) 216 (11) 217 (3) 218 (2) 219 (8) | Contingency Funding to Address Staff Vacancies (PDF 320KB) | 1/1/2023 |
ESSB 5689 | 222 (21) | Study on cost-effective strategies to maximize walk-on passenger of the Anacortes/San Juan ferry routes | 1/6/2023 |
ESSB 5689 | 216 (15) (d) | Safety Rest Area Report - Additional Operations and Maintenance Activities (PDF 625KB) | 1/15/2023 |
ESSB 5689 | 216 (16) (f) | Safety Rest Area Anti-Human Trafficking Informational Poster Report (PDF 113KB) | 1/15/2023 |
SHB 1655 | 2 (3) | Implemented or Planned Changes to Safety Rest Area Operations (PDF 109KB) | 1/15/2023 |
ESSB 5689 | 218 (4) | Small Business Enterprise Set-Aside Report (PDF 125KB) | 1/31/2023 |
ESSB 5689 | 308 (2) | Semi-annual WSF Project Status Update | 2/2/2023 Semi-Annually |
ESSB 5689 | 220 (2) & (3) | Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY23 Quarters 1 & 2 (PDF 257KB) | 2/15/23 Semi-Annually |
ESSB 5689 | 311 | Capital projects quarterly report - Quarter ending December 31, 2022 (PDF 1.03MB) | 2/15/23 Quarterly |
ESSB 5689 | 601 (1) (k) | Administrative Transfers (PDF 253KB) | 2/15/23 Quarterly |
RCW 47.01.485 | 2 | Report on any local permit application that takes longer than 90 days. (PDF 122KB) | 3/1/2023 Annually |
RCW 47.85.040 | 5 | Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 275KB) | 3/1/2023 Annually |
ESSB 5689 | 309 (2) | Freight Rail Investment Bank (FRIB) Progress Report (PDF 83.3KB) | 3/17/23 |
ESSB 5689 | 216 (9) | Public Health Associated with Homeless Encampments on Department Owned Rights of Way, May 2023 (PDF 955KB) | 5/1/2023 |
ESSB 5689 | 311 | Capital projects quarterly report | 5/15/2023 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 5/15/2023 Quarterly |
ESSB 5689 | 209 (3) (b) | New Tolling Back Office System Report (PDF 519KB) | 5/16/2023 |
ESSB 5689 | 707 | State Commercial Aviation Coordinating Commission Final Report (PDF 616KB) | 6/15/2023 |
SSB 5092 | 129 (99) | Creates a new Aviation and Aerospace Advisory Committee supported by Dept. of Commerce. Includes WSDOT Secretary or designee as Aviation Director as admin. co-chair. A strategic plan must be developed for the Dept of Commerce's aerospace, aviation, and airport economic development program, with guidance from the Advisory committee. | 6/30/2023 |
ESSB 5689 | 219 (3) | Vehicle Miles Traveled Targets - Final Report (PDF 1.29MB) | 6/30/2023 |
SSB 5975 | 209 (3) | I-5 Master Plan - Interim Report (PDF 2.73MB) | 6/30/2023 |
SSB 5975 | 209 (4) | I-5 Near-Term and Longer-Term HOV Recommendations - Interim Report (PDF 2.35MB) | 6/30/2023 |
ESSB 5689 | 219 (9) | Performance Based Project Evaluation Model Report (PDF 1MB) | 6/30/2023 |
ESSB 5689 | 221 (15) (a) | Frequent Transit Service Study Final Report (PDF 628KB) | 6/30/2023 |
ESSB 5689 | 222 (19) | Mukilteo Multimodal Terminal Solar Power Generation Report | 6/30/2023 |
ESSB 5689 | 223 (3) | Ultra High-Speed Ground Transportation Report (PDF 775KB) | 6/30/2023 |
SSB 5092 | 129 (99) | Aviation and Aerospace Advisory Committee Strategic Plan | 6/30/2023 |
SSB 5975 | 303 (5) | US 2 Westbound Trestle Status Report (PDF 3.58MB) | 6/30/2023 |
RCW 81.104.115 | 9 | 2022 Rail Fixed Guideway Public Transportation System Safety Report (PDF 6.81MB) | 6/30/2023 (Annually) |
ESSB 5689 | 219 (6) | SR302 Victor Area Corridor Study (PDF 27.1MB) | 6/30/2023 |
ESSB 5689 | 220 (2) & (3) | Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES | 8/15/2023 Semi-Annually |
ESSB 5689 | 311 | Capital projects quarterly report | 8/15/23 Quarterly |
SSB 5165 | 601 (1) (l) | Administrative Transfers | 8/15/23 Quarterly |
SSB 5165 | 209 (2)
209 (5)
| I-405 Express Toll Lane Project Performance Measure Reports
The Use of Consultants Non-Vendor Costs Vendor-Related Costs Toll Adjudication Process Summary of Toll Revenue by facility | 11/30/2023 |